Request for Proposals (RFP) for Storm Repairs in Snoqualmie Tribe Ancestral Forest
Snoqualmie Indian TribeSnoqualmie, Washington
The work includes engineering surveys, hydrologic/hydraulic analysis, construction drawings, culvert replacement, roadway reconstruction, slope stabilization, and full FEMA Public Assistance documentation. The project must be completed by August 31, 2027, with final closeout by September 30, 2027. Respondents must have experience in forested mountain terrain, FEMA Category C compliance, and Tribal environmental and cultural protocols. The selected contractor will be an independent contractor under Tribal jurisdiction.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 19, 2026
- Submission
- Documents analyzed
- 1
Scope of work
- Repair 4 culverts on Mainline Road (3x60in CMP, 1x36in parallel CMP)
- Restore 740 ft of 20 ft wide gravel road with 4 in surfacing and 6 in base
- Reconstruct 130 ft of 18 ft wide gravel road with 1 in surfacing
- Stabilize rockfall zone on Zackuse Road with engineered scaling
- Restore 31 ft x 4 ft vegetated swale and 3 ft x 31 ft gravel shoulder
- Conduct geotechnical and hydrologic/hydraulic analysis for all sites
Steps to Bid
- 1
Ensure all documents are signed by an authorized representative
What you'll need
Contract duration
120 calendar days from Notice to Proceed
Submission
NAICS
541330, 237199, 541311
How to submit
Submit all proposal documents as a single PDF or ZIP file to [email available with Pro]. Include the RFP number in the subject line. Late submissions will not be accepted.
Get alerts for bids like this
New paving bids in Washington
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
Work locations include Mainline Road, Forgue Louie Road, Kaya Road, Zackuse Road, and associated culverts and swales. Required services include topographic and geotechnical surveys, hydrologic/hydraulic analysis, 60%, 90%, and 100% stamped construction drawings, environmental and historic preservation compliance, erosion control, rock scaling, slope stabilization, culvert cleaning/replacement, roadway base and surfacing reconstruction, and full FEMA Public Assistance documentation. The selected contractor will serve as an independent contractor and must comply with Tribal sovereignty, employment rights, and dispute resolution under Snoqualmie Tribal Courts.
Documents
- RFP_STAF_STORM-REPAIRS.pdf16 pages
More from this agency
Similar bids near Snoqualmie
- NW Sammamish Road / SE 56th Street Pavement Preservation Project · Issaquah · closes Dec 18, 2026
- ITB Sand, Rock & Gravel · Seattle · closes Dec 1, 2026
- Request for Qualifications: Kent Des Moines Road and 16th Ave S Stormwater Project · Des Moines · closes Dec 2, 2026
- S Boeing Access Road Overlay Project — City of Tukwila · Tukwila · closes Dec 22, 2026
- NE 68th St Pedestrian and Bicyclist Safety Improvements · Kirkland · closes Dec 2, 2026
Closing soon near Snoqualmie
- Agricultural Drainage Ditch Maintenance in Lake Hills Greenbelt · Bellevue · closes Nov 30, 2026
- Reimagining Spaces at Kent Library - Phase 2 General Contractor · Issaquah · closes Dec 2, 2026
- COB HR & Financial Systems Scoping, Planning & Technology Decision Assessment · Bellevue · closes Dec 3, 2026
- 173rd Avenue NE Sidewalk between Northup Way and NE 1900 Block · Bellevue · closes Dec 3, 2026
- Meydenbauer Bay Park Phase 2 - GC/CM Services · Bellevue · closes Dec 4, 2026