REQUEST FOR QUALIFICATIONS, CONSTRUCTION MANAGER AT RISK SERVICES, UNIVERSITY OF MAINE ENERGY CENTER (UMEC)
University of Maine — Capital Planning & Project ManagementOrono, Penobscot, Maine#2027-031
Bidders must submit a Statement of Qualifications by December 17, 2026, at 2:00 p.m. to Jacob Olsen at [email available with Pro]. Submissions must include one original, five hard copies, and one PDF on a USB drive. The selected CM will negotiate a preconstruction agreement under AIA A133 with a GMP.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 17, 2026
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 6 items · full checklist with Pro
Scope of work
- Maintain continuous steam supply during phased construction and cutover
- Coordinate with design team and separate electrical infrastructure project
- Develop and manage a Guaranteed Maximum Price (GMP) with trade bids and scope clarity
- Manage construction within the GMP and contract terms, including subcontractor oversight
Steps to Bid
- 1
Submit written questions by the deadline
Submit questions in writing to Jacob Olsen at [email available with Pro] by December 3, 2026, at 4:00 p.m. Responses will be posted on the University’s website.
- 2
Prepare and submit the Statement of Qualifications
Prepare a complete submission including: (1) Letter of Interest and Firm Profile; (2) Three completed case histories; (3) Key personnel resumes; (4) Capacity and availability statement; (5) Three client references; (6) Additional relevant information. Submit one original, five hard copies, and one PDF on a USB flash drive.
What you'll need
Insurance
RequiredThe CM shall provide insurance and payment/performance bonds as required by the executed agreement and University construction contract documents.
Submission
Mail, Hand delivery
NAICS
561720
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 6-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The selected CM will participate in preconstruction planning, estimating, constructability analysis, procurement, and development of a Guaranteed Maximum Price (GMP), subject to University approval. The project aims to improve reliability, resiliency, renewable fuel use, and long-term energy cost stability. The target construction budget is approximately $75 million. The CM will coordinate with the design team, commissioning agent, and a separate electrical infrastructure project involving dual 4,160-volt feeders. Key responsibilities include cost estimation, schedule development, subcontractor qualification, construction supervision, safety and quality management, and coordination of shutdowns, temporary systems, and utility tie-ins. Submissions must include a letter of interest, firm profile, three completed case histories, key personnel resumes, capacity and availability, references, and additional relevant information. Written questions are due by December 3, 2026, at 4:00 p.m. Responses will be posted by December 8, 2026. Qualifications must be submitted by December 17, 2026, at 2:00 p.m. to Jacob Olsen, Senior Director of Capital Planning and Project Management, at the University of Maine System, Office of Facilities Management, 5765 Service Building, Room 107, Orono, ME 04469-5765. Late or faxed submissions will not be accepted. The University may elect not to proceed to construction or accept a proposed GMP. The CM must provide insurance and payment/performance bonds as required.
Key dates
- Questions due
- Dec 3, 2026, 4:00 PM Eastern Time
- Bids due
- Dec 17, 2026
Documents
- UMEC_CMaR_RFQ_2027-031-1.pdf6 pages
More from this agency
- UM Jenness Hall Renovation Phase 1 Demolition, Abatement, and Fireproofing · closes Dec 15, 2026
- Data Transport Services for K-20 Schools, Libraries, and Research Institutions · closes Dec 18, 2026
- Request for Bids: Natural Gas Supply for University of Maine Orono Locations · closes Oct 24, 2027
Similar bids near Orono
- University of Southern Maine Public Private Partnership (P3) Sullivan Gym Project · Orono · closes Feb 12, 2027
- Fuel Cell Hangar Construction · Bangor · closes Dec 21, 2026
- Request for Qualifications: Architectural and Engineering Services for Addition and Alteration at Bangor Air National… · Bangor · closes Nov 30, 2026
- Sealed Bids — Town Of Lincoln - Public Works · Lincoln · closes Dec 1, 2026
- Commercial Space Available for Lease at 2 Public Landing, Camden Waterfront · Camden · closes Dec 11, 2026
Closing soon near Orono
- Request for Qualifications: Architectural/Engineering Services for Addition and Alteration at Building 513, Bangor Air… · Bangor · closes Nov 30, 2026
- Curtis Island Access Stairs Replacement: Evaluation, Design, Fabrication, and Installation · Camden · closes Dec 1, 2026
- Curtis Island Access Stairs Replacement – Town of Camden, Maine · Camden · closes Dec 1, 2026
- Addition and Alteration of Aircraft Ground Equipment Facility and Office Space at Bangor Air National Guard Base, Maine · Bangor · closes Dec 4, 2026
- Tax Anticipation Note ("TAN") RFP for 2027 · Bangor · closes Dec 4, 2026