OpenRFQCloses Dec 17, 2026

REQUEST FOR QUALIFICATIONS, CONSTRUCTION MANAGER AT RISK SERVICES, UNIVERSITY OF MAINE ENERGY CENTER (UMEC)

University of Maine — Capital Planning & Project ManagementOrono, Penobscot, Maine#2027-031

Bidders must submit a Statement of Qualifications by December 17, 2026, at 2:00 p.m. to Jacob Olsen at [email available with Pro]. Submissions must include one original, five hard copies, and one PDF on a USB drive. The selected CM will negotiate a preconstruction agreement under AIA A133 with a GMP.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 17, 2026
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
6 items · full checklist with Pro

Scope of work

  • Maintain continuous steam supply during phased construction and cutover
  • Coordinate with design team and separate electrical infrastructure project
  • Develop and manage a Guaranteed Maximum Price (GMP) with trade bids and scope clarity
  • Manage construction within the GMP and contract terms, including subcontractor oversight

Steps to Bid

  1. 1

    Submit written questions by the deadline

    Submit questions in writing to Jacob Olsen at [email available with Pro] by December 3, 2026, at 4:00 p.m. Responses will be posted on the University’s website.

  2. 2

    Prepare and submit the Statement of Qualifications

    Prepare a complete submission including: (1) Letter of Interest and Firm Profile; (2) Three completed case histories; (3) Key personnel resumes; (4) Capacity and availability statement; (5) Three client references; (6) Additional relevant information. Submit one original, five hard copies, and one PDF on a USB flash drive.

What you'll need

Insurance

Required

The CM shall provide insurance and payment/performance bonds as required by the executed agreement and University construction contract documents.

Submission

Mail, Hand delivery

NAICS

561720

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 6-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The selected CM will participate in preconstruction planning, estimating, constructability analysis, procurement, and development of a Guaranteed Maximum Price (GMP), subject to University approval. The project aims to improve reliability, resiliency, renewable fuel use, and long-term energy cost stability. The target construction budget is approximately $75 million. The CM will coordinate with the design team, commissioning agent, and a separate electrical infrastructure project involving dual 4,160-volt feeders. Key responsibilities include cost estimation, schedule development, subcontractor qualification, construction supervision, safety and quality management, and coordination of shutdowns, temporary systems, and utility tie-ins. Submissions must include a letter of interest, firm profile, three completed case histories, key personnel resumes, capacity and availability, references, and additional relevant information. Written questions are due by December 3, 2026, at 4:00 p.m. Responses will be posted by December 8, 2026. Qualifications must be submitted by December 17, 2026, at 2:00 p.m. to Jacob Olsen, Senior Director of Capital Planning and Project Management, at the University of Maine System, Office of Facilities Management, 5765 Service Building, Room 107, Orono, ME 04469-5765. Late or faxed submissions will not be accepted. The University may elect not to proceed to construction or accept a proposed GMP. The CM must provide insurance and payment/performance bonds as required.

Key dates

Questions due
Dec 3, 2026, 4:00 PM Eastern Time
Bids due
Dec 17, 2026

Documents

  • UMEC_CMaR_RFQ_2027-031-1.pdf6 pages

See all documents · Download with Pro

More from this agency

Similar bids near Orono

Closing soon near Orono