Request for Qualifications for Progressive Design-Build Services for a 100-Million-Gallon Raw Water Reservoir and Associated Infrastructure
Lower Cape Fear Water and Sewer AuthorityLeland, North Carolina
The project will be delivered via a progressive design-build approach in two phases. Firms must submit a Statement of Qualifications (SOQ) by 2:00 PM local time on January 14, 2027, in three hard copies and one digital copy on a thumb drive, sealed and delivered to LCFWASA at 1107 New Pointe Blvd, Suite 17, Leland, NC 28451. A pre-submittal meeting is scheduled for December 2, 2026, at 2:00 PM. The total estimated project budget is $71,000,000. Communication with LCFWASA staff or consultants is restricted to official channels. LCFWASA reserves the right to reject any or all SOQs.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 14, 2027
- Time stated in bid documents
- Jan 14, 2027, 2:00 PM Eastern Time
- Performance bond
- Required
- Payment bond
- Required
- Submission
- mail, hand delivery
- Contract term
- The contract will be executed in two phases: Phase 1 (pre-construction and design) and Phase 2 (construction). The final contract will be based on the DBIA Stan
- Documents analyzed
- 1
Scope of work
- Construct a 100-million-gallon raw water reservoir with embankments, excavation, and liner
- Install a raw water pump station and large-diameter transmission mains
- Provide overflow and drain facilities, valves, controls, and electrical/SCADA systems
- Develop site access, fencing, and security for the reservoir site
- Complete permitting, design, and construction of associated infrastructure
Steps to Bid
- 1
Register and prepare the Statement of Qualifications (SOQ) in accordance with the RFQ requirements.
- 2
Attend the pre-submittal meeting on December 2, 2026, at 2:00 PM at LCFWASA headquarters in Leland, NC. by Dec 2, 2026, 2:00 PM
- 3
Submit all questions by December 14, 2026, to Tim H. Holloman at [email available with Pro], with a copy to David Cowell at [email available with Pro]. by Dec 14, 2026, 11:59 PM
- 4
Prepare and submit the SOQ in three hard copies and one digital copy on a thumb drive, sealed in an envelope marked 'PROPOSAL' with the due date. by Jan 14, 2027, 2:00 PM
- 5
Ensure all required documentation is included, including a one-page cover letter, up to 25 pages of content, and Appendix A (resumes and subcontractor plan). by Jan 14, 2027, 2:00 PM
What you'll need
Contract duration
The project is expected to be completed in two phases. Phase 1 (pre-construction and design) is expected to be completed by February 14, 2028. Phase 2 (construction) is expected to be completed by May 8, 2028, following execution of the GMP Amendment.
Submission
Mail, Hand delivery
NAICS
541330, 237199, 541610
How to submit
Submit three (3) hard copies and one (1) thumb drive with digital copy of the SOQ and Appendix A in a sealed envelope. Mark the outside of the envelope with 'PROPOSAL' and the due date. Email submissions are not accepted.
In person/mail: Lower Cape Fear Water and Sewer Authority, Attn: Executive Director Tim H. Holloman, 1107 New Pointe Blvd, Suite 17, Leland, NC 28451
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
0160005801 and 01600058), near the Northwest Water Treatment Plant at 3954 Clearwell Drive NE, Leland, NC. The project will be delivered in two phases: Phase 1 (design and pre-construction services) and Phase 2 (final design and construction). Proposers must not communicate with LCFWASA staff or consultants outside of official channels. The RFQ is not an offer to contract and does not obligate LCFWASA to award a contract.
Key dates
- Pre-bid meeting
- Dec 2, 2026, 2:00 PM Eastern Time
- Bids due
- Jan 14, 2027
Documents
- 2026_11_13_RFQ_LCFWASA_Reservoir_Final.pdf13 pages
Similar bids near Leland
- Request for Qualifications: Founders Park Amphitheater Audio-Visual Systems Design · Leland · closes Dec 16, 2026
- RFQ - Fall Protection Assessment, Design & Implementation Services · Wilmington · closes Dec 15, 2026
- Design, Fabrication, Delivery, and Installation of Wall Graphics and Smaller Signs for the Fisher Student Center · Wilmington · closes Dec 18, 2026
Closing soon near Leland
- Unified Development Ordinance (UDO) and Stormwater Management Ordinance (SMO) Update — Request for Qualifications · Oak Island · closes Nov 30, 2026
- Portable Toilets and Hand Washing Stations · Sneads Ferry · closes Dec 1, 2026
- Dune Planting Project Phase 2 · Oak Island · closes Dec 2, 2026
- Officer and Healthcare Patches – Columbus Sewing Plant · Whiteville · closes Dec 2, 2026
- 2nd Street Garage Elevator Modernization · Wilmington · closes Dec 3, 2026