Request for Qualifications: Prequalification for HDD Subcontractor on Pen 3A Water Transmission Main Phase 1 Project
Charleston Water System CharlestonSouth Carolina
Charleston Water System is seeking prequalified HDD contractors for the Pen 3A Water Transmission Main Phase 1 Project. The scope includes installing 19,000 linear feet of water main in multiple sizes via HDD, including 4,110 ft of 36-inch steel, 1,230 ft of 36-inch HDPE, and 2,350 ft of 36-inch steel. Applicants must hold a current SC LLR General Contractors License WL5 and provide references demonstrating on-time project delivery. Prequalification is required for all HDD work. Applications are available from Hussey Gay Bell. Questions must be directed to Alan Townsend, P.E.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 18, 2026, 5:00 PM Eastern Time
- Submission
- email, mail
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Perform HDD work in public rights-of-way and private easements
- Serve as subcontractor to Open-Cut (Prime) Contractor
Steps to Bid
- 1
Obtain the application package from Hussey Gay Bell by contacting Alan Townsend, P.E., at (843) 849-7500 or [email available with Pro].
- 2
Complete and submit the Application for Prequalification for HDD Subcontractor. by Dec 18, 2026, 5:00 PM
What you'll need
Prequalification
RequiredSubmission
Email, Mail
NAICS
237130, 237199
How to submit
Submit completed application to Hussey Gay Bell via email or mail. Contact Alan Townsend, P.E., for application package.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The Commissioners of Public Works of the City of Charleston, South Carolina, d/b/a Charleston Water System (CWS or Owner), is seeking prequalified Horizontal Directional Drill (HDD) Contractors for the Pen 3A Water Transmission Main Phase 1 Project. All HDD work must be performed by a contractor pre-qualified by CWS. The HDD Contractor will serve as a subcontractor to the Open-Cut (Prime) Contractor, whose prequalification will occur at a later date. Applications are available by contacting Hussey Gay Bell at (843) 849-7500 or [email available with Pro].
Key dates
- Bids due
- Dec 18, 2026
Closing soon in South Carolina
- Request for Lease Proposal: Office and Lab Space for South Carolina Department of Natural Resources in Richland County · closes Nov 30, 2026
- SCDOT Performance Audit · closes Nov 30, 2026
- Arco Lane HVAC System Replacement – Professional Services Solicitation · closes Dec 1, 2026
- Indefinite Quantity Contract for Architectural Services · closes Dec 2, 2026
- Timber Sale WTSF 16 ADV TS 27 · closes Dec 3, 2026