OpenRFQCloses Dec 18, 2026

Request for Qualifications: Prequalification for HDD Subcontractor on Pen 3A Water Transmission Main Phase 1 Project

Charleston Water System CharlestonSouth Carolina

Charleston Water System is seeking prequalified HDD contractors for the Pen 3A Water Transmission Main Phase 1 Project. The scope includes installing 19,000 linear feet of water main in multiple sizes via HDD, including 4,110 ft of 36-inch steel, 1,230 ft of 36-inch HDPE, and 2,350 ft of 36-inch steel. Applicants must hold a current SC LLR General Contractors License WL5 and provide references demonstrating on-time project delivery. Prequalification is required for all HDD work. Applications are available from Hussey Gay Bell. Questions must be directed to Alan Townsend, P.E.

On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 18, 2026
Time stated in bid documents
Dec 18, 2026, 5:00 PM Eastern Time
Submission
email, mail
Required submission items
3 items · full checklist with Pro

Scope of work

  • Perform HDD work in public rights-of-way and private easements
  • Serve as subcontractor to Open-Cut (Prime) Contractor

Steps to Bid

  1. 1

    Obtain the application package from Hussey Gay Bell by contacting Alan Townsend, P.E., at (843) 849-7500 or [email available with Pro].

  2. 2

    Complete and submit the Application for Prequalification for HDD Subcontractor. by Dec 18, 2026, 5:00 PM

What you'll need

Prequalification

Required

Submission

Email, Mail

NAICS

237130, 237199

How to submit

Submit completed application to Hussey Gay Bell via email or mail. Contact Alan Townsend, P.E., for application package.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Commissioners of Public Works of the City of Charleston, South Carolina, d/b/a Charleston Water System (CWS or Owner), is seeking prequalified Horizontal Directional Drill (HDD) Contractors for the Pen 3A Water Transmission Main Phase 1 Project. All HDD work must be performed by a contractor pre-qualified by CWS. The HDD Contractor will serve as a subcontractor to the Open-Cut (Prime) Contractor, whose prequalification will occur at a later date. Applications are available by contacting Hussey Gay Bell at (843) 849-7500 or [email available with Pro].

Key dates

Bids due
Dec 18, 2026

Closing soon in South Carolina