Peru WMA – Off Andes Road Area Survey Services
Department of Fish and Game — DFW - Division of Fisheries and WildlifeMassachusetts#BD-27-1046-DFW-FWE11-135222
MassWildlife seeks a qualified surveyor to retrace and monument the boundary between Lots 8 and 9 in the Beals subdivision, Peru, MA, adjacent to MassWildlife’s Upper Westfield River WMA. The survey must identify encroachments, roads, streams, and other features. A pre-work meeting is required. The project must be completed by May 31, 2027. Only vendors on the FWE-SURVEY-26 list may respond. Quotes must be submitted electronically via COMMBUYS by December 8, 2026, at 1:00 p.m. EST.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 8, 2026
- Time stated in bid documents
- Dec 8, 2026, 1:00 PM Eastern Time
- Submission
- electronic portal
- Documents analyzed
- 3 published · 2 analyzed
Scope of work
- Survey 1,300 feet of boundary line between Lots 8 and 9 in the Beals subdivision
- Install iron pins with magnetic markers (e.g., MagSpike) at unmonumented corners
- Identify encroachments, roads, trails, streams, stone walls, and utility poles
Steps to Bid
- 1
Register and maintain active status in COMMBUYS.
- 2
Submit written questions via the COMMBUYS 'Bid Q&A' tab by November 18, 2026, at 1:00 p.m. EST. was Nov 18, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit a complete quote via the 'Create Quote' function in COMMBUYS by December 8, 2026, at 1:00 p.m. EST. by Dec 8, 2026, 1:00 PM
What you'll need
Contract duration
1,300 feet of line to be surveyed, with work to be completed no later than May 31, 2027.
Submission
Electronic portal
NAICS
541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The Division of Fisheries and Wildlife (MassWildlife) is soliciting quotes from FWE-SURVEY-26 vendors to retrace existing surveys and set monumentation on the Upper Westfield River WMA - Dwight parcel property, Massachusetts. The work includes surveying approximately 1,300 feet of boundary line between Lots 8 and 9 in the Beals subdivision, which abuts MassWildlife land. Iron pins or capped iron pins (monumentation) must be installed at unmonumented corners and course changes, with magnetic markers (e.g., MagSpike) placed at the base of each hole. A pre-work meeting is required at MassWildlife’s Western District Office prior to work commencement. The project must be completed by May 31, 2027, with final invoice due by July 15, 2027. The solicitation is restricted to vendors on the Department of Fish & Game’s FWE-SURVEY-26 vendor list.
Key dates
- Questions due
- Nov 18, 2026, 1:00 PM Eastern Time
- Bids due
- Dec 8, 2026
Documents
- 1_FY2027_Land_Survey-Request_for_Quote-Peru-Andes_Road_FINAL.docx
- 2_Peru-Andes_maps_diagrams_deed.pdf
- 5_eea-land-acquisition-policy-surveys-01-06-15.pdf9 pages
More from this agency
- Firebreak Improvement and Construction at the ACOE Birch Hill Dam — closes Nov 24, 2026
- Roger Reed Generator Improvements — closes Nov 25, 2026
- Woody Fuels Reduction at Frances Crane (North) WMA — closes Nov 30, 2026
- DFW-2027-039 Mashpee Pine Barrens WMA Tree Thinning — closes Nov 30, 2026
- Grant Notice: On-Demand Gear Grant and Research Program — closes Nov 30, 2026
Similar open bids
- Request for Quote: Ashby WCE, North County Land Trust CR-Hardy Road, Ashby 'Special Use Area' Survey — Department of Fish and Game
- Land Survey for Crane Pond WMA, Pillsbury Street, Georgetown — Department of Fish and Game
- Montague WMA - Hillside Drive Survey Services, Connecticut Valley District — Department of Fish and Game
- Land Survey Services for Nissitissit River WMA – Brookline Street, Pepperell — Department of Fish and Game
- Employee Satisfaction/Retention Surveys 2027 — Veterans' Home in Holyoke
Closing this week nearby
- Multifunction Device Procurement — closes Nov 20, 2026
- Window Replacement at Beaudry-Boucher Apartments, 68 Cabot St, Holyoke, MA — closes Nov 20, 2026
- Installation and Construction of Backup Generator at Cambridge Community Center – Reilience Hub Project — closes Nov 20, 2026
- Food Service Equipment for Natick, MA — closes Nov 23, 2026
- Process Server — closes Nov 23, 2026