Resurface 38.378 Miles of State Highways in Knox and Shelby Counties, Missouri
Missouri Department of Transportation — MoDOTMissouri#261218-B05
MoDOT is soliciting bids to resurface 38.378 miles of state highways in Knox and Shelby Counties, Missouri, including Routes W, V, V Spur, B, and E. Work includes permanent aggregate edge treatment, gravel or crushed stone, tack coat, temporary traffic control, mobilization, pavement marking, cold milling, and bituminous pavement mixture PG58-28H (surface leveling). The contract completion date is November 1, 2027. Liquidated damages of $1,500 per day for contract administrative costs and $1,800 per day for road user costs apply for delays. The contractor must comply with Missouri Standard Specifications for Highway Construction, including prevailing wage requirements, stormwater compliance, Buy America requirements, and contractor quality control. The contractor must designate a Water Pollution Control Manager (WPCM) and submit a Pre-Activity Meeting report. The bid bond must be submitted electronically via Bid Express. The contractor must obtain a digital ID in advance of the bid opening.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 11:00 AM CT
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 304 calendar days from the Notice to Proceed
- Documents analyzed
- 4 published · 2 analyzed
Steps to Bid
- 1
Obtain a digital ID from Bid Express at least 5 business days before the bid opening. by Dec 13, 2026, 12:00 PM
- 2
Submit the bid electronically via Bid Express by 11:00 a.m. (local time) on December 18, 2026.
What you'll need
Submission
Electronic portal
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Contract 261218-B05, Missouri Department of Transportation (MoDOT), for resurfacing 38.378 miles of state highways across Knox and Shelby Counties, Missouri. Work includes Route W, Route V, Route V Spur, Route B, and Route E. The project is part of MoDOT's December 18, 2026, letting.
Key dates
- Questions due
- Dec 13, 2026, 12:00 PM Central Time
- Bids due
- Dec 18, 2026, 11:00 AM CT
Documents
- 261218_B05_JST0182_BID_BOOK.pdf15 pages
- 261218_B05_JST0182_JSP_Roadway.pdf33 pages
- 261218_B05_JST0182_PLANS.pdf21 pages
- 261218_Notice_To_Contractors.pdf8 pages
More from this agency
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- MoDOT KC District - Half Ton Crew Cab Long Bed Pickups Price Quote Request — closes Nov 19, 2026
- Commercial Rotary Cutters for Missouri Highways and Transportation — closes Nov 19, 2026
- Culvert Replacement and ADA Improvements over Muddy Creek in Harrisonville, Route 2, Cass County — closes Nov 20, 2026
- ADA Improvements and Pavement Replacement on Route 96 in Jasper County — closes Nov 20, 2026
Similar open bids
- Coldmill, Resurface, and ADA Improvements on Route BU60, Route BB, Route P, Route 39, and Route BU60 in Newton, Barry,… — Missouri Department of Transportation
- Coldmill, Resurface, Roundabout and Turn Lanes on Route 60 in Barry and Lawrence County — Missouri Department of Transportation
- Resurface from Route E to Route D near Charleston and Route A near Chaffee, Scott County — Missouri Department of Transportation
- Coldmill and Resurface Route 61, 27 Clark, Lewis County — Missouri Department of Transportation
- Resurface Route 61 Scott County — Missouri Department of Transportation
Closing this week nearby
- Re-Post-EV4630 Immigration and Refugee Health Clinic Civil Surgeon — closes Nov 17, 2026
- Hickory County School Dist R 1: E-Rate FY2027 Category 2 - Antennas, Connectors, and Related Components; Switches and… — closes Nov 17, 2026
- Hickory County School Dist R 1: E-Rate FY2027 Category 2 - Firewall Service, Components, and Necessary Software and… — closes Nov 17, 2026
- Wheaton School District R 3: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 17, 2026
- Wheaton School District R 3: E-Rate FY2027 Category 2 - Firewall Service, Components, and Necessary Software and… — closes Nov 17, 2026