Resurfacing (microsurface or thin mix overlay) from S.R. 52 (L.M. 10.56) to the Kentucky State line (L.M. 20.09), Macon County, TN
Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN263071
10.56 to the Kentucky State line (L.M. 20.09) in Macon County, TN. The work must be completed by August 31, 2027. Bids are due via the internet (Bid Express) by 10:00 A.M. Central on December 4, 2026. Internet bidding is mandatory. Bidders must obtain bid authorization by 4:00 P.M. Central the day before the letting. Contractors must be in good standing with the Tennessee Secretary of State. The bid bond must be 5% of the bid amount, submitted electronically.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- internet
- Documents analyzed
- 2
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Resurface 9.53 miles of S.R. 52 from L.M. 10.56 to the Kentucky State line
- Use microsurface or thin mix overlay for resurfacing
Steps to Bid
- 1
Download the bid documents, including the Proposal Contract, Plans, and Specifications, from the TDOT Construction Division website.
- 2
Submit questions to the Headquarters Construction Office at (615) 741-2414 before the deadline for questions, which is not explicitly stated but is typically 5-7 days before the letting.
- 3
Review all addenda posted on the Bid Express website until 2:00 P.M. Central the day before the letting. by Dec 3, 2026, 2:00 PM
- 4
Submit the electronic bid bond (5% of the bid amount) via Bid Express by the same deadline. by Dec 4, 2026, 10:00 AM
What you'll need
Contract duration
On or before 8/31/2027
Submission
Internet
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contract No. CN263071, Call No. 032 - Macon County Project No. STP/HSIP-56(108), 56S056-F8-002 (PIN 135020.00), 56S056-F3-002 (PIN 135020.00): The resurfacing (microsurface or thin mix overlay) from S.R. 52 (L.M. 10.56) to the Kentucky State line (L.M. 20.09). Project Length - 9.530 miles. Completion Time - On or before 8/31/2027 (See Special Provision 108B). Failure to do so results in rejection. The Department will not execute contracts with entities not in good standing.
Key dates
- Bids due
- Dec 4, 2026, 10:00 AM CT
Documents
- 20261204_NoticeToContractors.pdf14 pages
- 20261204_InstructionsToBidders.pdf4 pages
More from this agency
- Resurfacing on U.S. 51 (S.R. 3) from Sylvan Road to Ramp 17C to S.R. 77, including bridge expansion joint repair and… · closes Dec 4, 2026
- Microsurfacing on S.R. 39 from near County Road 469 to S.R. 310, McMinn County, TN · closes Dec 4, 2026
- Resurfacing on S.R. 74 from near S.R. 60 to U.S. 11E (S.R. 2) – Bradley County · closes Dec 4, 2026
- Grading, Drainage, and Paving on U.S. 25W (S.R. 9) at Intersection of West Beaver Creek Drive, Knox County · closes Dec 4, 2026
- Grading, Drainage, Retaining Wall Construction, and Paving on U.S. 127 (S.R. 8) from S.R. 27 (Suck Creek Road) to… · closes Dec 4, 2026
Similar bids in Tennessee
- Call for Artists: Public Art Commission for Suspended Sculpture – Concourse A: Skylights Node · closes Jan 17, 2027
- Lease, Construction, Operation, and Management of T-Hangar Facilities at Springfield-Robertson County Airport
- Deputy Inspectors - Building · closes Jun 30, 2027
- Three Star Grant Ridgely Civic Center Renovation · closes Dec 3, 2026
- Resurfacing on S.R. 22 from near I-40 to the Carroll County line - Henderson County · closes Dec 4, 2026
Closing soon in Tennessee
- CIP 25-10-007 – Sanford Drive Water Line Replacement · closes Dec 1, 2026
- Furnishing 828 XARM Insulator Pins Holes 23kV and 63,700 Feet of 4-Inch Polyethylene Pipe · closes Dec 1, 2026
- Utility Shed Relocation and Replacement on Columbia Campus · closes Dec 2, 2026
- Replacement of HVAC Units at the White County Courthouse · closes Dec 4, 2026
- Resurfacing on S.R. 106 from Marshall County line to Williamson County line (including S.R. 99 from L.M. 28.81 to L.M.… · closes Dec 4, 2026