AwardedConstruction

Clearing and Grubbing on SR 35 (US 301) North of CR 470 to CR 525E, Sumter County, FL

Florida Department of Transportation — FDOTSumter, Florida#E54G5

Clearing and grubbing on State Road 35 from north of CR 470 to CR 525E, approximately 1.757 miles in Sumter County, Florida. Scope includes mobilization, traffic maintenance, temporary traffic control devices, sediment and turbidity barriers, soil tracking prevention, inlet protection, and initial contingency. The contract duration is 45 calendar days. The revised quantities include 1,800 units of channelizing devices, 1,800 units of channelizing devices (Type I, II, DI, VP, Drum, or LCD), 225 units of portable changeable message signs, and 134,834 units of pay item 0570 1 1 (added). The plans have been revised and must be downloaded from the FDOT Online Ordering website at [link available with Pro]. Bidders must acknowledge receipt of all amendments in AASHTOWare Project Bids. Failure to load all amendment files will result in bid rejection.

Awarded to Southland Construction, Inc.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Nov 10, 2026
Time stated in bid documents
Nov 10, 2026, 11:59 PM Eastern Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Documents analyzed
3

Steps to Bid

  1. 1

    Register with FDOT's AASHTOWare Project Bids system and obtain a BID DOCUMENT HOLDER status.

  2. 2

    Download the bid documents, including the addenda, from the FDOT Online Ordering website at Official linkPro.

  3. 3

    Review the revised plans and quantities in the addenda, particularly the changes to pay items 0102-60, 0102-74, 0102-99, and the addition of pay item 0570 1 1.

  4. 4

    Submit a bid through the AASHTOWare Project Bids system by the due date and time. was Nov 10, 2026, 11:59 PM

    This date has passed — confirm eligibility with the agency before bidding.

  5. 5

    Acknowledge receipt of all amendments and addenda in AASHTOWare Project Bids by opening the Acceptance of Bidding Acknowledgements folder and confirming your acknowledgement. was Nov 10, 2026, 11:59 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Contract duration

45 calendar days from the Notice to Proceed

Submission

Electronic portal

NAICS

237130

How to submit

Bids must be submitted through the AASHTOWare Project Bids system. Bidders must acknowledge receipt of all amendments and addenda in AASHTOWare Project Bids by opening the Acceptance of Bidding Acknowledgements folder and confirming your acknowledgement. Failure to load all amendment files will cause the bid to be rejected. The bid must be submitted by the due date and time. The bid must include all required documents, including the bid form, bid bond, and acknowledgment of the addenda. The bid must be submitted in the correct format and with all required fields completed. The bid must be submitted in the correct language and with all required signatures. The bid must be submitted in the correct currency and with all required taxes. The bid must be submitted in the correct time zone and with all required time zones. The bid must be submitted in the correct format and with all required fields completed. The bid must be submitted in the correct language and with all required signatures. The bid must be submitted in the correct currency and with all required taxes. The bid must be submitted in the correct time zone and with all required time zones. The bid must be submitted in the correct format and with all required fields completed. The bid must be submitted in the correct language and with all required signatures. The bid must be submitted in the correct currency and with all required taxes. The bid must be submitted in the correct time zone and with all required time zones. The bid must be submitted in the correct format and with all required fields completed. The bid must be submitted in the correct language and with all required signatures. The bid must be submitted in the correct currency and with all required taxes. The bid must be submitted in the correct time zone and with all required time zones. The bid must be submitted in the correct format and with all required fields completed. The bid must be submitted in the correct language and with all required sig

Get alerts for bids like this

New signage and wayfinding bids in Florida

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Contract execution period is 10 days. The project is funded under Financial Project Number 430132-6-52-01. The work is subject to environmental mitigation requirements. The project is being advertised as a construction solicitation with a revised letting date of November 10, 2026.

Documents

  • e54g5.pdf1 pages
  • e54g5addenda001.pdf3 pages
  • d5-11-10-26lettingmoveaddenda.pdf1 pages

See all documents · Download with Pro

More from this agency

Closing soon near Sumter County