Reuel A. Stallones Building Rehabilitation and Repair — Construction Manager-At-Risk Services
The University of Texas Health Science Center at HoustonHouston, Texas#RFQ 744
The University of Texas Health Science Center at Houston is seeking a Construction Manager-At-Risk (CMAR) to manage the rehabilitation and repair of the Reuel A. Stallones building. The CMAR will provide full project management services during design and construction. Responses must be submitted via email to [email available with Pro]. The project is located in Houston, Texas.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 4, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 4, 2026, 2:00 PM Central Time
- Submission
Scope of work
- Manage contractor selection and change orders
- Ensure cost control, scheduling, and quality assurance
- Coordinate all aspects of rehabilitation and repair work
Steps to Bid
- 1
Prepare and submit a proposal via email to [email available with Pro] by December 4, 2026, at 2:00 PM Central Time. by Dec 4, 2026, 2:00 PM
What you'll need
Submission
NAICS
561320, 238290
How to submit
Submit proposal via email to [email available with Pro]. No physical submission required.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
The scope includes full project management, risk mitigation, cost control, scheduling, and coordination of design and construction activities for the rehabilitation and repair work. The CMAR will be engaged during the design phase and will continue through construction and closeout. The selected CMAR will be responsible for managing all aspects of the project, including contractor selection, change order management, and quality assurance.
Key dates
- Bids due
- Dec 4, 2026, 2:00 PM CT
Documents
- 744-Q2702-CMAR-RAS-Rehabiliaton-Repair-CMAR-09-18-26-KH-IR-09-29.doc
More from this agency
- Reuel A. Stallones Building Rehabilitation and Repair – Construction Manager-At-Risk Selection · closes Dec 4, 2026
- Sewage Ejection Pump Replacement at UTHealth Houston Medical School · closes Dec 10, 2026
- Replacement of Fan Coil Units, Exhaust Air Valves, and Supply Air Valves at the School of Nursing · closes Dec 14, 2026
- SRB AHU and Controls Replacement · closes Dec 16, 2026
- HCPC Interior Revitalization · closes Jan 7, 2027
Similar bids near Houston
- Construction of Phase 2 Detention Facilities to Serve Wild Oak, Fort Bend Municipal Utility District No. 252 · Houston · closes Dec 3, 2026
- CON | Z1DA | REPLACE OR CHILLERS | 580-23-105 | PRESOLICITATION · Houston · closes Dec 2, 2026
- Harwin Drive & Hillcroft Avenue Intersection Reconstruction · Houston · closes Dec 17, 2026
- Project Water Supply Operator · Houston · closes Dec 9, 2026
- Agrawal Laboratory Build Out FY27 · Houston · closes Dec 11, 2026
Closing soon near Houston
- The Purchase and Delivery of Six Motorcycles for the METRO Police Department · Houston · closes Dec 2, 2026
- IAH Terminal D HVAC Efficiency Upgrades · Houston · closes Dec 3, 2026
- HAS - IAH Subway Operations & Maintenance · Houston · closes Dec 3, 2026
- Stamped Concrete Replacement at Avenida de las Americas and Rusk Street Crosswalks · Houston · closes Dec 3, 2026
- Venus Thrombosis (VT) · Houston · closes Dec 4, 2026