Burruss Park Bridge Construction
Marietta, City OfMarietta, Georgia#PE-63363-NONST-2027-000000034
The City of Marietta is soliciting bids for the removal of an existing triple 42-inch culvert under Burruss Park's main trail and its replacement with a 60-foot prefabricated vehicular-rated bridge. Scope includes removal of culverts, headwalls, trail surface, trees, construction of abutments, stream bank improvements, and coordination with bridge delivery and installation. The bridge will be furnished by the City. The project must be completed in 90 calendar days from notice to proceed. Bids must be submitted electronically via [link available with Pro] by 10:00 AM on December 4, 2026. A mandatory pre-bid meeting is required on November 23, 2026, at 10:00 AM at 75 South Cobb Drive, Marietta, GA 30060. The bid bond is 5% of the bid amount. Performance and labor and material payment bonds are required at 100% and 110% of the contract amount, respectively.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 110%
- Submission
- electronic portal
- Contract term
- 90 calendar days from notice to proceed
- Documents analyzed
- 1
Scope of work
- Construct bridge abutments and improve stream bank
- Complete work within 90 calendar days from notice to proceed
Steps to Bid
- 1
Review the full solicitation documents, including all addenda, on Official linkPro.
- 2
Submit all questions through the Official linkPro Q&A platform by 5:00 PM on November 30, 2026. by Nov 30, 2026, 5:00 PM
- 3
Attend the mandatory pre-bid meeting on November 23, 2026, at 10:00 AM at 75 South Cobb Drive, Marietta, GA 30060. by Nov 23, 2026, 10:00 AM
- 4
Register and create an account on the Official linkPro platform.
- 5
Download and complete the City-provided bid forms, including the Bid Proposal, Bid Bond, and required affidavits.
- 6
Upload all completed forms, signed and notarized, to the Official linkPro platform before the deadline. by Dec 4, 2026, 10:00 AM
What you'll need
Contract duration
90 calendar days from notice to proceed
Submission
Electronic portal
NAICS
237130, 237199, 237310
How to submit
All bids must be submitted electronically through the Official linkPro platform. Bidders must upload completed and signed City bid forms and all required supporting documents. Paper, mailed, emailed, or faxed bids will not be accepted. The submission timestamp recorded by Official linkPro shall govern timeliness.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The general contractor must coordinate all work with the delivery of the prefabricated bridge. No roadway paving or improvement work is included. Temporary lane closures or blockages for bridge delivery require prior written approval. The City reserves the right to reject all bids and to waive formalities.
Key dates
- Pre-bid meeting
- Nov 23, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 4, 2026
Documents
- 202611_supportingdocs_PE-63363-NONST-2027-000000034-2026-11-17_16_57_11-613d.pdf61 pages
Similar open bids
- T32-D1-BridgeMtc-SR 105-Habersham-194760 — Transportation, Department Of
- T32-D5-Bridge-Chatham-194828 — Transportation, Department Of
- IFB #505-26 Bridge Preventative Maintenance on Steele Bridge Road Over Amicalola Creek — Dawson County Board Of Commissioners
- Pi M006586 - Bridge Preservation @ 7 Loc In Columbia; Lincoln & Wilkes Co — Georgia Department of Transportation
- Pi M006587 - I-75 @ 9 Locs In Bartow County - Bridge Preservation — Georgia Department of Transportation
Closing this week nearby
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- Intersection Improvements at Eight Locations — closes Nov 20, 2026
- IWQ 111026, Purchase of Building Materials — closes Nov 20, 2026
- Beaver Ruin Diversion Pump Station Grinders Replacements Project — closes Nov 20, 2026