Meadows Water Treatment Facility and Intake Station Emergency Backup Generators
City of BransonBranson, Missouri#2905-05
This project involves furnishing labor, materials, and equipment for the complete construction of emergency backup generators for both facilities. A bid bond of 5% of the total bid amount is required. The successful bidder will need to provide a performance bond and a payment bond, each for 100% of the contract price. Prevailing wage rates determined by the Missouri Division of Labor Standards must be paid. Contractors must be enrolled in a federal work authorization program and provide proof of OSHA safety training for on-site employees. The project completion time is 270 consecutive calendar days from the Notice to Proceed.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 1, 2026, 1:30 PM CT
- Time stated in bid documents
- Dec 1, 2026, 1:30 PM Central Time
- Bid bond
- 5%
- Performance bond
- Required
- Payment bond
- Required
- Submission
- electronic portal
- Contract term
- 270 consecutive calendar days
- Documents analyzed
- 3 published · 2 analyzed
Scope of work
- Furnish and install diesel-engine-driven generator sets with accessories for the Meadows Water Treatment Facility and Intake Station.
- Includes site grading and foundation work for generator installations.
- Covers electrical tie-in and transfer switches for both facilities.
Steps to Bid
- 1
Submit bids electronically via DemandStar. by Dec 1, 2026, 1:30 PM
MAILED/HAND-DELIVERED/FAXED/EMAILED BIDS WILL NOT BE ACCEPTED.
- 2
Questions regarding bidding documents must be submitted in writing. by Nov 21, 2026
Questions must be received by the Purchasing Department not later than ten (10) days prior to the bid opening date.
What you'll need
Contract duration
270 consecutive calendar days
Award method
Award will be made to the lowest responsive, responsible Bidder, on the total base Bid.
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 9 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bids will be received on a lump sum and unit price basis. Contractors or subcontractors doing work on the Project must provide and require its on-site employees to complete a ten (10) hour course in construction safety and health approved by OSHA or a similar program.
Key dates
- Questions due
- Nov 21, 2026
- Bids due
- Dec 1, 2026, 1:30 PM CT
Documents
- Bid Opening Instructions.pdf1 pages
- RFB 2905-05 Meadows Water Treatment Facility And Intake Stat.pdf135 pages
- Plans_Meadows Generators 2026-10-01.pdf
More from this agency
- RFB 2900-16 Annual Lift Station Pump Rebuilds/Replacements 2027 — closes Nov 20, 2026
- Voting System Microwave Upgrade — closes Nov 30, 2026
- Compton Drive Wastewater Treatment Facility Emergency Backup Generators — closes Dec 1, 2026
- City Hall Ground Floor Renovations – Request for Qualifications — closes Dec 3, 2026
- RFB 2904-03 Hoist Inspections & Maintenance — closes Dec 4, 2026
Similar open bids
- Combustion & Steam Turbine Generator Maintenance Services — City of Columbia (Missouri)
- Purchase of Five (5) White Minivans — Kansas City Area Transportation Authority (KCATA)
- Purchase of 18-Inch Gas-Powered Positive Pressure Ventilation (PPV) Fans, Series 7 Model with Honda GX200 Engine — City of St. Louis
- Baggage Conveyor Parts Supply Contract — City of St. Louis
- Data Transport Services and Dark Fiber — University of Missouri System
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026