Diagnosis and Repair of Solar PV Canopy at W.W. Keeler Tribal Administration Complex
Cherokee NationTahlequah, Cherokee, Oklahoma#165030
Keeler Tribal Administration Complex in Tahlequah, Oklahoma. The work includes safely de-energizing the system, identifying the root cause of failure, proposing repairs, and providing a detailed repair estimate. Site visits are scheduled for November 17 and 19, 2026.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026, 11:59 PM CT
- Submission
- Documents analyzed
- 1
Scope of work
- Diagnose fault in solar PV canopy system at W.W. Keeler Tribal Administration Complex
- Safely de-energize solar PV and EV charging systems
- Identify repairs needed and propose solutions
- Provide detailed repair estimate with diagnostic methodology
Steps to Bid
- 1
Attend one of the two mandatory site visits on November 17 or 19, 2026, between 9:00 a.m. and 4:00 p.m. Contact Eleanor Sandifer at 971-322-4318 or [email available with Pro] to schedule. was Nov 19, 2026, 4:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit all questions in writing to Janice Vaughan at [email available with Pro] by November 24, 2026, at 5:00 p.m. Central Time. by Nov 24, 2026, 5:00 PM
- 3
Prepare and complete the mandatory bid response sheet, including total bid amount, estimated start and completion dates, and confirmation of compliance with all specifications.
What you'll need
Submission
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Keeler Tribal Administration Complex, 17675 S Muskogee Ave, Tahlequah, OK 74464. The scope includes safely de-energizing the solar PV and electric vehicle (EV) charging systems, diagnosing the fault causing system failure, identifying required repairs, assessing equipment warranties, proposing repair solutions, and providing a detailed repair estimate with diagnostic methodology. Bidders must submit a completed mandatory bid response sheet, including a total bid amount, estimated start and completion dates, and confirmation of full compliance with specifications. Questions must be submitted in writing by November 24, 2026, at 5:00 p.m. Site visits are scheduled for November 17 and 19, 2026, between 9:00 a.m. and 4:00 p.m. The contract is subject to availability of funds.
Key dates
- Questions due
- Nov 24, 2026, 5:00 PM Central Time
- Site visit
- Nov 17, 2026, 9:00 AM Central Time
- Bids due
- Dec 2, 2026, 11:59 PM CT
Documents
- 165030_RFB_-_Diagnosis__Repair_of_Solar_PV_Canopy_Project.pdf8 pages
More from this agency
- 2-Bedroom HUD-Compliant Manufactured Home with Installation and Site Setup — closes Nov 23, 2026
- 3-Bedroom HUD-Compliant Manufactured Home with Installation and Site Setup — closes Nov 23, 2026
- Two (2) Half-Ton 4x4 Trucks, New Model, Equal to or Better — closes Nov 30, 2026
- Stilwell Recovery Center Construction – Request for Sealed Bids — closes Dec 1, 2026
- Building Concrete - Claremore Outpatient & Emergency Health Center - Cherokee Nation — closes Dec 4, 2026
Closing this week nearby
- Sealed Bids: Demolition and Purchase of Used Sheet Metal from Old District 2 Barn, Coalgate, OK — closes Nov 20, 2026
- Housing, Mechanical — closes Nov 20, 2026
- Bid Notice — Pittsburg County — closes Nov 20, 2026
- Wiring Harness, Branched — closes Nov 20, 2026
- Sealed Bids: Perry Town Square Phase 1, Noble County District #2 — closes Nov 20, 2026