RFP for Hibulb Cultural Center Sewer Main Repair Project
Tulalip TribesTulalip, Washington#2026-26
The work includes excavation, removal of damaged pipe, replacement with code-compliant materials, installation of cleanouts, backfilling, concrete restoration, and site cleanup. A walkthrough is scheduled for November 20, 2026, at 9:00 AM. All communications must be directed to Jason Crain at [email available with Pro].
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 3:30 PM Pacific Time
- Submission
- Documents analyzed
- 2
- Required submission items
- 5 items · full checklist with Pro
Scope of work
- Excavate and remove damaged sewer pipe
- Install replacement piping compliant with code requirements
- Backfill and compact excavated areas
- Restore concrete slab to match existing conditions
- Remove debris and excess materials from site
Steps to Bid
- 1
Attend the walkthrough on November 20, 2026, at 9:00 AM at the Hibulb Cultural Center, 6410 23rd Avenue NE, Tulalip, WA 98271. was Nov 20, 2026, 9:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit a proposal electronically to Anthony Matta at [email available with Pro] by 3:30 PM PST on December 4, 2026. by Dec 4, 2026, 3:30 PM
What you'll need
Submission
NAICS
238290
How to submit
Electronic proposals shall be submitted to: AnthonyMatta, Facilities Maintenance Tech III, [email available with Pro]. Proposals must be received no later than 3:30 PM PST on December 4, 2026. If proposal files exceed 15 MB, contact the Project Manager regarding alternative delivery methods.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The selected contractor shall furnish all labor, supervision, equipment, materials, tools, permits, transportation, disposal services, and incidentals necessary to complete the work. Proposals must be submitted electronically to Anthony Matta at [email available with Pro] by 3:30 PM PST on December 4, 2026. A walkthrough is available on November 20, 2026, at 9:00 AM at the Hibulb Cultural Center, 6410 23rd Avenue NE, Tulalip, WA 98271. All communications about this procurement must be directed in writing to Jason Crain, Crain Advisors, at [email available with Pro].
Key dates
- Pre-bid meeting
- Nov 20, 2026, 9:00 AM Pacific Time
- Bids due
- Dec 4, 2026
Documents
- Hibulb_Sewer_RFP.pdf8 pages
- Hibulb_HVAC_Pre-Solicitation_Notice-v2.pdf3 pages
More from this agency
- Hibulb Cultural Center Mechanical Systems Repair and Upgrade · closes Dec 11, 2026
- Statement of Qualifications for Replacement of Countertops, Sinks, Fixtures, Flooring, and Partitions in Tulalip… · closes Dec 11, 2026
Similar bids in Washington
- Lavatory Counters and Sink Assembly · closes Dec 7, 2026
- Alpine Ridge Water, Sewer, and Electrical Maintenance & Repair · closes Dec 1, 2026
- Alpine Ridge - Water, Sewer, & Electrical Maintenance & Repair · closes Dec 1, 2026
- Subcontractor Bid Request: Electrical Demo and Sewer Lift Scope — Timberline High School CTE Annex · closes Dec 8, 2026
- Perforated HDPE Pipe for Drainage Improvement Projects — 2027 Season · Sunnyside · closes Dec 3, 2026
Closing soon in Washington
- Master BPA for Firefighter Personal Protective Equipment (PPE) Cleaning, Inspection, Repair, and Maintenance Services · closes Nov 30, 2026
- S--Janitorial Services Rapid City, SD · closes Nov 30, 2026
- Columbia Heights HVAC Replacement · closes Dec 1, 2026
- Purchase of Rals Middleware and eQuiz Software for Point of Care Glucose Data Management · closes Dec 4, 2026
- BEAD Broadband Engineer · closes Dec 5, 2026