Front Street Lift Station Wet Well Expansion and New Parallel Force Main Project
City of Traverse CityTraverse City, Michigan#RFP-2026-11-12
The project includes expanding the wet well to increase surge storage, designing a new force main parallel to the existing 16-inch cast-iron line, and resolving pump performance issues. The Consultant will provide full engineering services from surveying to construction administration. A mandatory pre-bid meeting is scheduled, and questions must be submitted by December 10, 2026. The City will evaluate proposals based on technical approach (25 points), firm qualifications (30 points), relevant project experience (25 points), and fee competitiveness (20 points). The selected firm will be required to maintain $1,000,000 comprehensive general liability insurance with the City named as additional insured, $1,000,000 professional liability insurance, and workers’ compensation coverage. The project is expected to be awarded in February 2027, with design completion in January 2028 and construction to follow.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 14, 2027
- Time stated in bid documents
- Jan 14, 2027, 5:00 PM Eastern Time
- Submission
- Contract term
- 36 months + Two (2) additional one-year renewal terms
- Documents analyzed
- 2 published · 1 analyzed
Scope of work
- Expand wet well laterally to property boundary for increased surge storage
- Evaluate and resolve pump ragging and cavitation issues
- Replace suction and discharge piping, isolation and check valves
- Assess feasibility of adding a fourth pump to reduce bypass pumping
- Replace pump controls and evaluate pump replacement options including submersible pumps
Steps to Bid
- 1
Review the RFP and all attachments, including historical records, condition assessments, and hydraulic data.
- 2
Submit questions in writing to [email available with Pro] by December 10, 2026, at 5:00 PM. by Dec 10, 2026, 5:00 PM
- 3
Attend the mandatory pre-bid conference (date and time to be announced).
- 4
Prepare and submit a single PDF proposal (20 pages maximum) to [email available with Pro] by January 14, 2027, at 5:00 PM. by Jan 14, 2027, 5:00 PM
What you'll need
Contract duration
120 calendar days from Notice to Proceed
Submission
NAICS
541330
How to submit
Submit one PDF file electronically to [email available with Pro]. The subject line must read: 'Proposal for Front Street Lift Station Wet Well Expansion and New Parallel Force Main Project'. Proposals must not exceed 20 pages (11x17 sheets count as two pages). Hard copies are not accepted. Late submissions will not be considered.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes surveying, preliminary engineering, detailed design, permitting support, bidding assistance, and construction-phase services. The project involves expanding the existing wet well laterally to the property boundary to increase surge storage volume, and designing and constructing a new parallel force main alongside the existing 16-inch cast-iron force main from the lift station to the Traverse City Regional Wastewater Treatment Plant. The existing force main will be preserved for future rehabilitation as a redundant backup. Required services include evaluation and resolution of pump ragging and cavitation issues, replacement of suction and discharge piping, isolation and check valves, and assessment of electrical and generator capacity. The Consultant must also evaluate the feasibility of adding a fourth pump, replace pump controls, assess compatibility of maintenance access and lifting equipment, and recommend a grinding system for influent. The project requires a geotechnical study, environmental analysis, traffic control and erosion control plans, and construction phasing. The Consultant will prepare construction documents, permit applications, and bid documents. Construction-phase services include daily inspections, review of contractor submittals and change orders, progress meetings, and preparation of daily inspection reports (IDRs) with field notes, weather data, equipment and personnel logs, and photos. As-built drawings must be submitted electronically in AutoCAD and PDF formats within 90 days of project closeout. The proposal must be submitted electronically as a single PDF file not exceeding 20 pages (11x17 sheets count as two pages) to [email available with Pro] by January 14, 2027, at 5:00 PM. The RFP includes a mandatory pre-bid conference, and questions must be submitted by December 10, 2026, at 5:00 PM.
Key dates
- Questions due
- Dec 10, 2026, 5:00 PM Eastern Time
- Bids due
- Jan 14, 2027
- Expected award
- Feb 1, 2027
Documents
- Front_Street_Lift_Station_RFP_11-12-2026.pdf29 pages
- Addendum _231_ Lift Station.pdf1 pages
More from this agency
- Two Mini Wheel Loaders with Attachments · closes Nov 25, 2026
- Stormwater Asset Management and Water Quality Plan Update · closes Dec 11, 2026
Closing soon near Traverse City
- Request for Proposals (RFP) for Services and Supplies — Central Lake Public Schools · Central Lake · closes Nov 30, 2026