OpenRFPCloses Dec 11, 2026

Resident Project Representative and Construction Inspection Services for North Clinton Avenue Milling and Resurfacing Project

City of RochesterRochester, New York

The scope includes roadway resurfacing, sidewalk and curb replacement, ADA-compliant curb ramp upgrades, protected bicycle infrastructure, traffic signal enhancements, new street lighting, and utility adjustments. Proposals must be submitted electronically by 12:00 PM on December 11, 2026, to Andrew Wojewodzic. The selected firm must comply with the Rochester Living Wage Ordinance and submit monthly workforce reports.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 11, 2026
Time stated in bid documents
Dec 11, 2026, 12:00 PM Eastern Time
Submission
email
Contract term
36 months + Two additional one-year renewal terms
Documents analyzed
4 published · 3 analyzed

Scope of work

  • Provide full-time NICET Level IV Engineer-in-Charge and NICET Level II/III inspectors
  • Conduct construction observation, quality assurance, and daily reporting
  • Review contractor invoices, change orders, and submittals
  • Coordinate with contractors, utilities, public, and City staff
  • Submit monthly workforce reports via LCP Tracker system

Steps to Bid

  1. 1

    Register and obtain bid documents

    Bid documents, including specifications and drawings, are available for review via email at [email available with Pro] or online at [link available with Pro] starting November 16, 2026.

  2. 2

    Attend pre-bid meeting

    A pre-bid meeting is scheduled for December 1, 2026, at 10:00 AM. Attendance is encouraged but not mandatory.

  3. 3

    Submit questions by deadline

    All questions must be submitted by 12:00 PM on December 4, 2026, to [email available with Pro]. Responses will be sent to all bidders and posted on the City’s website.

What you'll need

Contract duration

563 calendar days from April 2027

Submission

Email

NAICS

541330, 541610

How to submit

Proposals must be submitted as a single PDF file to [email available with Pro]. The file must include a table of contents, page numbers, and references to the RFP sections. All attachments must be included in the PDF.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project includes roadway, pedestrian, and utility reconstruction to improve safety, accessibility, and multi-modal operations. Scope includes milling and resurfacing of the roadway, removal and replacement of curbs, sidewalks, and non-compliant curb ramps, full-depth pavement reconstruction in localized areas, installation of a protected cycle track and dedicated bicycle lanes, curb extensions and bump-outs at intersections, mid-block and raised crosswalks, Rectangular Rapid Flashing Beacons (RRFBs), upgraded traffic signals with accessible pedestrian features, new street lighting from Marietta Street to Upper Falls Boulevard, bus stop landing pads with seating and bicycle racks, new street trees, and utility work including adjustments to manholes, valves, and pull boxes, and construction of new drainage basins.

Key dates

Questions due
Dec 4, 2026, 12:00 PM Eastern Time
Pre-bid meeting
Dec 1, 2026, 10:00 AM Eastern Time
Bids due
Dec 11, 2026
Expected award
Jan 1, 2027

Documents

  • RFP_RPR_Services_-_North_Clinton_Avenue.pdf9 pages
  • Exhibit_A_-_North_Clinton_Milling_and_Resurfacing_Draft_PSA.pdf
  • Exhibit_D_-_Consultant_Information_Form.pdf2 pages
  • Exhibit_E_-_Project_Communications_Flowchart.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar bids near Rochester

Closing soon near Rochester