OpenIFBCloses Jan 27, 2027

RFP2027-01 - HVAC City of Duluth

Duluth, City OfGeorgia#PE-66750-NONST-2027-000000030

The project includes removing and replacing the AHU and installing a new open-source Building Automation System (BAS) to control existing HVAC components. A mandatory pre-bid conference is scheduled for December 10, 2026, at 10:00 AM ET at the project site.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 27, 2027
Time stated in bid documents
Jan 27, 2027, 11:00 AM Eastern Time
Submission
mail, hand delivery
Contract term
Other One Time Contract
Documents analyzed
4 published · 3 analyzed

Scope of work

  • Remove and replace existing 15-ton basement AHU.
  • Install new VAV controls, dehumidification, and economizer with powered exhaust.
  • Replace existing Carrier DDC controls with a new open-source BAS.
  • Upgrade controls for (5) AHU/rooftop units, (57) VAV units, and (1) exhaust fan.
  • New BAS front-end must match existing functionality (status, setpoints, alarms, etc.).

Steps to Bid

  1. 1

    Attend the mandatory pre-bid conference. by Dec 10, 2026, 10:00 AM

    Project site: 3167 Main Street, Duluth, Georgia 30096

  2. 2

    Submit questions in writing. by Dec 17, 2026, 5:00 PM

    Email questions to James Riker at [email available with Pro].

  3. 3

    Review addenda posted on the City's website or Georgia Procurement Registry. by Jan 7, 2027

    Answers to questions will be posted via addendum by this date.

  4. 4

    Submit sealed proposal packages. by Jan 27, 2027, 11:00 AM

    Address: City of Duluth, 3167 Main Street, Duluth, GA 30096, Attention: Teresa Lynn, City Clerk. Packages must include one original, two copies, and one digital version on a flash drive.

What you'll need

Contract duration

within an agreed upon time period

Submission

Mail, Hand delivery

NAICS

91017, 22014, 03167

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Task II focuses on replacing the obsolete Carrier DDC controls (Carrier Control Network) with a new open-source Building Automation System (BAS). This upgrade encompasses (5) air handling/rooftop units, (57) VAV units, and (1) exhaust fan. Existing units not specified are to remain and be controlled locally. The new front-end system must replicate the functionality of the existing equipment, including status, mode, setpoints, airflow, temperatures, occupancy, and alarms. The project location is 3167 Main Street, Duluth, Georgia 30096.

Key dates

Questions due
Dec 17, 2026, 5:00 PM Eastern Time
Pre-bid meeting
Dec 10, 2026, 10:00 AM Eastern Time · Mandatory
Site visit
Dec 10, 2026, 10:00 AM Eastern Time
Bids due
Jan 27, 2027

Documents

  • 202611_supportingdocs_PE-66750-NONST-2027-000000030-2026-11-17_08_50_37-cdb1.pdf23 pages
  • 202611_supportingdocs_PE-66750-NONST-2027-000000030-2026-11-17_08_50_38-0cb2.pdf4 pages
  • 202611_supportingdocs_PE-66750-NONST-2027-000000030-2026-11-17_08_50_38-c7d8.pdf2 pages
  • 202611_supportingdocs_PE-66750-NONST-2027-000000030-2026-11-17_08_50_44-62af.pdf

See all documents · Download with Pro

Similar open bids

Closing this week nearby