RFQ: CIHA, FY27-08 ICDBG Asbestos Containing Material (ACM) Flooring Demo and Abatement
Confederated Tribes of the Colville ReservationNespelem, Washington
The scope includes demolition, disposal, clearance, and documentation. The project must be completed within 21 consecutive calendar days. Quotations are due by 3:00 PM local time on December 9, 2026, and must be submitted on the Form of Quote with required attachments. A pre-proposal meeting is mandatory and will be held onsite on December 2, 2026, at 10:00 AM.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 9, 2026
- Time stated in bid documents
- Dec 9, 2026, 3:00 PM Pacific Time
- Submission
- mail, fax, email
- Documents analyzed
- 1
Scope of work
- Remove 1,019 sq. ft. of flooring and underlayment containing asbestos
- Bag and transport ACM to approved disposal facility
- Submit clearance testing results within 2 working days of completion
- Comply with EPA AHERA, NESHAPS, and OSHA regulations
Steps to Bid
- 1
Review the full RFQ and all attached documents, including the Scope of Work, Form of Quote, and required attachments.
- 2
Attend the mandatory pre-proposal meeting onsite at 1047 Mushroom Corner on December 2, 2026, at 10:00 AM. by Dec 2, 2026, 10:00 AM
What you'll need
Contract duration
21 consecutive calendar days
Submission
Mail, Fax, Email
NAICS
238990, 561490
How to submit
Quotations must be submitted on the Form of Quote, along with all required attachments, as specified in the RFQ. Hard copies must be delivered to the address above, or faxed to (509) 634-2335, or emailed to [email available with Pro]. Electronic copies must be in PDF format.
In person/mail: Colville Indian Housing Authority, P.O. Box 528, 42 Convalescent Center Boulevard, Nespelem, Washington 99155
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes removal of all flooring and underlayment layers (approximately 1,019 sq. ft.), including cove base, baseboard heaters, and fasteners. ACM must be bagged and transported to an approved disposal facility (e.g., Okanogan County Landfill or Graham Road Recycling & Disposal Facility). Clearance requires thorough cleaning and submission of air sampling PCM analysis report and clearance testing results within two working days of completion. Box 528, Nespelem, WA 99155, via fax at (509) 634-2335, or by email to [email available with Pro]. Davis-Bacon wage rates apply, and weekly payroll reports are required. 450e(b).
Key dates
- Pre-bid meeting
- Dec 2, 2026, 10:00 AM Pacific Time
- Bids due
- Dec 9, 2026
Documents
- FY27_08_ICDBG_Asbestos_Containing_Material_ACM.pdf73 pages
More from this agency
- Fall PCT, Olds Cr., Cook Cr., Gold Mt., Jones, Wells, Lynx, Stranger Cr., Elbow Lake · closes Dec 10, 2026
- Inchelium District Forestry Mastication Services · closes Dec 10, 2026
- Tribal Government Strategic Planning and Long-Term Governance Development · closes Dec 10, 2026
- Asbestos Containing Material (ACM) Flooring Demo and Abatement Project · closes Dec 17, 2026
- RFP: F&W, Well Drilling and Pump Test, Louie Creek Property, Sanpoil River Valley · closes Dec 22, 2026
Closing soon near Nespelem
- RFP: CTHCA, physical therapy services at the Omak Tribal Health Clinic (OTHC) · Nespelem · closes Dec 1, 2026
- Loup 115kV Transmission Line Rebuild Project · Okanogan · closes Dec 1, 2026
- Environmental Trust, Owhi Drywell Inspection 2026 · Nespelem · closes Dec 2, 2026
- Tonasket Ranger Station HVAC Replacement Building 2007 · Tonasket · closes Dec 3, 2026
- RFP: Roger’s Bar Church Restoration – Design-Build Services · Nespelem · closes Dec 4, 2026