OpenRFQCloses Dec 16, 2026

RFQ: Construction Manager at Risk for Carteret County Public Safety Building Project

Carteret CountyNorth Carolina

Carteret County is soliciting qualified Construction Manager at Risk (CMAR) firms for a 78,000-square-foot detention center and associated site development on a 41-acre site in Beaufort, NC. The project includes early site work (grading, stormwater, utilities, access, parking) and final construction of a facility for 267 beds (expandable to 400), with a 10,000-square-foot evidence storage building as an add alternate. Moseley, Inc. is the design team. The CMAR will provide pre-construction, bidding, and construction management services. Submittals are due by December 16, 2026, 3:00 p.m. EST. Questions must be submitted by December 3, 2026, 5:00 p.m. ET.

On PublicBidSearch: the original bid posting and 1 bid document for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 16, 2026
Time stated in bid documents
Dec 16, 2026, 3:00 PM Eastern Time
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
Pre-construction phase contract will be awarded. Construction phase contract will be awarded after final GMP approval and notice to proceed.
Documents analyzed
1

Scope of work

  • Complete early site work including grading, stormwater controls, erosion controls, utilities, access, and parking
  • Construct a 10,000-square-foot evidence storage building with covered vehicle and equipment storage
  • Coordinate site development with building design for future expansion to 400 beds
  • Manage project schedule, cost, quality, and safety throughout the CMAR delivery method

Steps to Bid

What you'll need

Contract duration

Winter 2029

Submission

Mail, Hand delivery

NAICS

561110, 236220

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Carteret County is seeking qualified Construction Manager at Risk (CMAR) firms for the new Public Safety Building Project on a 41-acre site at 2303 U.S. Highway 70, Beaufort, NC. The project will be delivered in two coordinated tasks: Task 1 (early site work) includes grading, stormwater and erosion controls, utilities, access, and parking; Task 2 (final site development and construction) includes building a 78,000-square-foot detention center with 267 beds (expandable to 400), prefabricated steel cells, CMU holding cells, on-site medical suite, elevated control room, and a 10,000-square-foot evidence storage building with covered vehicle and equipment storage (bid as an add alternate). Moseley, Inc. is the project’s architect and engineer. Submittals must include six printed packages and one digital copy on a USB drive. The RFQ was advertised on November 2, 2026. Written questions must be submitted by email no later than December 3, 2026, 5:00 p.m. ET. Qualification packages are due by December 16, 2026, 3:00 p.m. EST. Contact: Ben Warren, Interim Assistant County Manager, 252-728-8545, [email available with Pro]. All inquiries must be directed to Mr. Warren.

Key dates

Questions due
Dec 3, 2026, 5:00 PM Eastern Time
Bids due
Dec 16, 2026

Documents

  • RFQ_Construction_Manager_at_Risk_Public_Safety_Building_Project.pdf34 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby