OpenRFQCloses Dec 11, 2026

RFQ for Sheffield Trail Phase 2 Design and Cost Estimate

City of FifeFife, Pierce, Washington

The City of Fife is seeking a qualified consultant to design Phase 2 of the Sheffield Trail, which includes 2,600 feet of trail from the 20th Street entrance toward completed Phase 1. The project will widen the trail, address root damage, improve drainage and safety, and enhance accessibility. The consultant will prepare construction plans, specifications, and cost estimates, including stormwater retrofit, water main replacement, trail lighting, and environmental compliance. The scope includes coordination with WSDOT, utility providers, and cultural resources. The consultant must have experience in similar projects, submit references, and include team and sub-consultant details. Proposals must be submitted electronically by December 11, 2026, at 5:00 p.m., in 8.5x11 format, not exceeding 15 pages.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 11, 2026
Time stated in bid documents
Dec 11, 2026, 5:00 PM Pacific Time
Submission
email
Contract term
12 months from the effective date of the contract
Documents analyzed
1

Scope of work

  • Develop trail illumination and landscape improvement plans
  • Conduct environmental review and secure necessary permits
  • Deliver final bid documents for construction bidding

Steps to Bid

  1. 1

    Register with the City of Fife procurement system if required

  2. 2

    Prepare a proposal including qualifications, references, team involvement, and sub-consultant details by Dec 11, 2026, 5:00 PM

  3. 3

    Submit the proposal electronically to [email available with Pro] by 5:00 p.m. on December 11, 2026 by Dec 11, 2026, 5:00 PM

What you'll need

Submission

Email

NAICS

541330, 541370

How to submit

Submit electronic copies to [email available with Pro]. All documents must be in 8.5x11 format, and the total package, excluding the introductory letter, must not exceed 15 pages.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The City of Fife Parks, Recreation, and Aquatics Department is seeking a qualified consultant to prepare plans, specifications, and a cost estimate for Phase 2 of the Sheffield Trail improvement project. Phase 1 is complete. The trail is narrow and has sustained damage from tree roots, creating uneven surfaces and limiting access for maintenance and repair equipment. The project will evaluate and design improvements to widen the trail, address root-related damage, and improve accessibility, safety, and long-term maintenance. Design considerations include drainage, retaining walls, pedestrian lighting, and landscape improvements, as appropriate to site conditions. The consultant will evaluate existing trees and incorporate measures to protect the improved trail from future root damage while preserving the corridor’s natural character where feasible. Completion of Phase 2 will enhance the trail experience, strengthen connections to the community library and surrounding streets, and support the trail’s function as a lahar evacuation route. The completed project will build on the city’s Phase 1 investment to provide a more consistent, accessible trail corridor for recreation and community connection. The scope includes project management and coordination over a 12-month design period, WSDOT coordination through a kickoff meeting and two design review meetings, field survey and mapping of the corridor, preparation of a survey basemap, right-of-way plans, and alignment data. Stormwater analysis and utility coordination include review of stormwater requirements, design of a replacement swale basin, preparation of a stormwater site plan and construction SWPPP, and coordination with utility providers. Cultural resources services are required for Section 106 compliance. Pedestrian illumination design includes an illumination report, coordination with Puget Sound Energy, and development of trail lighting plans. Environmental review, permitting, and mitigation require environmental data collection, site investigations, critical areas reporting, a mitigation plan, and documentation for Clean Water Act Section 401/404, Hydraulic Project Approval, SEPA, NEPA, and a biological assessment. Specialized technical services include arborist services, geotechnical investigation and infiltration testing, civil and structural engineering. Construction plans must include cover sheet, survey control, alignment data, typical trail sections, demolition and erosion control plans, wall and stormwater retrofit plans, trail illumination, water main replacement, landscape and irrigation plans, and right-of-way plans. The proposal must include a brief introductory letter. Submissions must be electronic, sent to [email available with Pro], and received by December 11, 2026, at 5:00 p.m. All documents must be in 8.5x11 format, and the total package, excluding the introductory letter, must not exceed 15 pages.

Key dates

Bids due
Dec 11, 2026

Documents

  • Sheffield Trail Phase 2 RFQ (002) 2610221504307250.pdf13 pages

See all documents · Download with Pro

Similar bids near Fife

Closing soon near Fife