OpenIFBCloses Jan 5, 2027
River Pump Station Rehabilitation Preliminary Engineering Report (CIP-2499)
Beaufort-Jasper Water and Sewer Authority — Beaufort - Jasper Water & Sewer AuthoritySouth Carolina#2027-RFP-013
The existing River Pump Station lifts water from the Savannah River into the BJWSA Canal. The building and most of its contents are original to the 1960's. The site has been evaluated by Staff to determine critical areas requiring repair, rehabilitation, or replacement. The Project scope of services includes but is not limited to Project Administration, Data Collection & Evaluation, and the development of a Preliminary Engineering Report to determine improvements to the River Pump Station, located in Hardeeville, SC.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Jan 5, 2027
Key dates
- Bids due
- Jan 5, 2027
Documents
- portal
More from this agency
- Purrysburg Alum Pond Annual Excavation · closes Dec 1, 2026
- Galvanized Waterline Replacement - Old Fort Road · closes Jan 6, 2027
Similar bids in South Carolina
- Environmental Services Disposal Transfer Station · closes Jan 6, 2027
- Design/Build Services for Bees Ferry Animal Services Emergency Procurement · closes Dec 8, 2026
- OPEN-ENDED ARCHITECTURE / ENGINEERING CONSULTANT · closes Dec 17, 2026
- Two (2) New Middle Schools - Architectural & Engineering · closes Dec 14, 2026
- Greenville Water Request for Qualification - General Engineering Services · closes Dec 10, 2026
Closing soon in South Carolina
- Reclamation and Paving of Existing Entrance Rd. and Parking Lot at American Legion Field · closes Nov 30, 2026
- Structured Literacy Instructional Materials, Decodable Readers, Professional Development, and Intervention Resources · closes Nov 30, 2026
- Requesting quotes for Multiplex Biomarker Analysis of Human Serum Samples (197 Samples) · closes Dec 1, 2026
- Request for Proposals: Underwriting Services · closes Dec 3, 2026
- FCI Edgefield 2nd Quarter Subsistence Requirements - Request for Quotation · closes Dec 4, 2026