OpenRFPCloses Jan 14, 2027, 5:00 PM CT

Access Road Construction for 8R Mid Field RVR and 15L RO RVR at George Bush Intercontinental Airport

Federal Aviation Administration — 697DCK REGIONAL ACQUISITIONS SVCSTexas#697DCK-27-R-00033

The Federal Aviation Administration (FAA) is soliciting proposals for the construction of access roads at George Bush Intercontinental Airport (IAH) in Houston, Texas. The project involves building an access road from Taxiway CC to the 8R Mid Point RVR sensor and extending an access road to Taxiway WP at 15L RO RVR. This is a two-tiered solicitation, prioritizing SBA Certified Small Businesses. Key requirements include earthwork, concrete, aggregate surfacing, and electrical installations. Safety on the airport, including adherence to the Construction Safety and Phasing Plan (CSPP), is paramount. The estimated start date is August 2, 2027. Bidders must comply with all specifications, drawings, and safety regulations. Access to the Airport Operations Area (AOA) is controlled and requires specific authorization. Foreign Object Debris (FOD) and wildlife management are critical. The bid number is 697DCK-27-R-00033.

On PublicBidSearch: the original bid posting, 11 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 14, 2027, 5:00 PM CT
Time stated in bid documents
Jan 14, 2027, 5:00 PM Central Time
Bid bond
Required
Performance bond
Required
Payment bond
Required
Submission
electronic portal
Documents analyzed
11 published · 7 analyzed

Scope of work

  • Perform earthwork, grading, and site preparation.
  • Install concrete and crushed aggregate surfacing.
  • Install electrical power and control cables.
  • Comply with stringent airport safety and operational requirements.

Steps to Bid

  1. 1

    Submit questions concerning the solicitation to [email available with Pro] by 5:00 p.m. CT on Tuesday, December 15, 2026. Late inquiries will not be considered. by Dec 15, 2026, 5:00 PM

  2. 2

    Submit proposals by the due date and time. by Jan 14, 2027, 5:00 PM

What you'll need

Submission

Electronic portal

NAICS

237310

How to submit

Proposals must be submitted by the due date and time. Specific submission instructions are not detailed in the provided documents, but typically involve electronic submission via Official linkPro or other specified portals for federal solicitations.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 9 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The solicitation is two-tiered, giving preference first to SBA Certified Small Businesses, and then to full and open competition if insufficient competition exists. Specific sections detail requirements for earthwork, crushed aggregate roads, topsoil and grass cover, concrete formwork and reinforcement, cast-in-place concrete, miscellaneous metals, rough carpentry, electrical methods and materials, underground power and control cable installation, and cable testing. Safety on airports, including general precautions, construction within classified areas, and maintenance of aircraft operating surfaces, is emphasized. Coordination with airport management, FAA personnel, and adherence to local and other codes are required. Temporary electrical power and sanitary facilities are the contractor's responsibility. The Construction Safety and Phasing Plan (CSPP) outlines procedures to ensure safety compliance and minimize conflict with airport operations. Work will be completed in two phases, outside the Runway Safety Area (RSA) of active runways, with minimal impact to aircraft operations. Access to the Airport Operations Area (AOA) is restricted and requires specific badging and escorts. Notification procedures for construction activities, including NOTAMs and emergency notifications, are detailed. Penalties for non-compliance with airport safety and security procedures may be issued. No work will impact runway and taxiway visual aids, and construction will not occur within the Runway Object Free Area (ROFA) or other critical airfield safety zones.

Key dates

Questions due
Dec 15, 2026, 5:00 PM Central Time
Bids due
Jan 14, 2027, 5:00 PM CT

Documents

  • 697DCK-27-R-00033.pdf
  • Attachment_1_IAH_Access_Road_Specification.pdf76 pages
  • Attachment_2_CSPP_for_HAS_IAH_Access_Road_Project.pdf21 pages
  • Attachment_3_IAH_drawings.pdf7 pages
  • Attachment_4_WD_TX202260299_05-18-26.pdf
  • Attachment_5_Site_Visit_Registration_Form.doc
  • Attachment_6_Past_Performance_Questionnaire.pdf2 pages
  • Attachment_7_Solicitation_Questions_Form.doc

3 more files

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby