Roof Replacement - Barton Annex, 501 N. East Street, Indianapolis, IN 46204
Indianapolis Housing AgencyIndianapolis, Indiana
The Indianapolis Housing Agency is seeking sealed bids for the full replacement of the roof system at the Barton Annex, 501 N. East Street, Indianapolis, IN 46204. The scope includes demolition of the existing ballasted roof system down to the tapered XPS insulation and installation of a new fully adhered 60-mil white TPO membrane system by Carlisle SynTec or an approved alternative. The work includes removal and reinstallation of existing roof copings, doors, frames, plumbing vent boots, and exhaust fan covers. The stairwells and elevator penthouse are now included in the base bid. The contractor must be approved by the membrane manufacturer and have at least five years of documented experience. A pre-bid meeting is scheduled for November 13, 2026, at 3:30 p.m. at the site. All bidders must acknowledge receipt of Addendum No. 1. The warranty is 20 years, covering both labor and materials. The project is not expected to commence in 2026 due to winter weather.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Nov 20, 2026
- Time stated in bid documents
- Nov 20, 2026, 2:00 PM Eastern Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Documents analyzed
- 4 published · 2 analyzed
Steps to Bid
- 1
Register with the Indianapolis Housing Agency and obtain the bid documents from their website at Official linkPro.
- 2
Attend the pre-bid meeting on November 13, 2026, at 3:30 p.m. at the Barton Annex, 501 N. East Street, Indianapolis, IN 46204. Attendance is mandatory. was Nov 13, 2026, 3:30 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Review the bid documents, including the Project Manual, Drawings, and Addendum No. 1, and submit any questions by the deadline specified in the Addendum.
- 4
Prepare and submit a sealed bid, including the bid guarantee, non-collusive affidavit, and acknowledgment of Addendum No. 1, by 2:00 p.m. Eastern Time on November 20, 2026. was Nov 20, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Contract duration
2026-11-20T14:00
Submission
Mail, Hand delivery
NAICS
236115, 236118
Get alerts for bids like this
New roofing bids in Indiana
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The scope includes complete demolition of the existing roof system—rock ballast, protection mat, EPDM membrane, cant strips, and fiberboard—down to the face of the existing tapered XPS insulation. The new roof system shall consist of a fully adhered 60-mil white TPO membrane system by Carlisle SynTec or an approved alternative, including SecurShield HD polyiso cover board, tapered insulation, flashing, termination bars, and walk pads. All work shall comply with manufacturer’s specifications, NRCA standards, and ASTM requirements. The scope explicitly includes the stairwells and elevator penthouse, which were previously marked 'no work' but are now included in the base bid per Addendum No. 1. The base bid must include all labor, materials, equipment, and supervision for the full scope. Alternate No. 1 is a deduction of $____ for removal of labor and material costs to replace roofing at the two stair towers and the elevator penthouse. Unit Price A is $____ per square for replacement of roof insulation. Work shall not be performed when ambient temperature is below 40°F or above 90°F. All debris must be removed from the site. The roof must provide positive drainage, with no standing water within 48 hours after precipitation. A framed roof certificate must be installed inside the penthouse in a weather-resistant container.
Documents
- Project_Manual_-_Barton_Annex_Roof_Repl__10-9-2026_.pdf
- 2026-10-08_-_IHA_Barton_Annex_Roof_Replacement_Bid_Set.pdf4 pages
- ADDENDUM_NO_1__BARTON_ANNEX_ROOF_REPLACEMENT.pdf1 pages
- Addendum_No._1_Roof_Replacement.pdf12 pages
More from this agency
- Barton Tower and Barton Annex Boiler Upgrades — closes Nov 20, 2026
Similar open bids
- Notice to Bidders: Replacement of sections of roofing at Jasper High School — Greater Jasper Consolidated School Corporation
- Notice to Bidders: Jasper High School Natatorium & Chemical Room Roof Replacement Project 2027 Jasper High School — Greater Jasper Consolidated School Corporation
- Notice to Bidders: Replacement of sections of roofing at John R. Wooden Middle School — MSD of Martinsville
- Kouts Roofing Restoration Project – Kouts Elementary and High School Roofs 18B and 20 — East Porter County School Corporation
- Carroll Middle School Reroof - Phase 2 — Northwest Allen County Schools
Closing this week nearby
- IU School of Medicine – Administrative Structure and Organizational Effectiveness Review — closes Nov 20, 2026
- Parking Garage Expansion – South & TNC Terminal Access Lanes — closes Nov 20, 2026
- Whitko Community School Corp: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service; Standalone… — closes Nov 20, 2026
- Parking Garage Expansion – South & TNC Terminal Access Lanes — Request for Proposals — closes Nov 20, 2026