Systemwide Pavement Repairs
THA - Toll Highway AuthorityIllinois#26-557THA-PROCU-B-54718
The Illinois Toll Highway Authority (THA) is seeking bids for Contract RR-26-2069, Systemwide Pavement Repairs. Bids must be submitted electronically via BidBuy by 10:30 a.m. local time on December 10, 2026. The work involves various pavement repairs, reflector replacement, striping, and crack sealing across multiple counties in Illinois. All bids must be on THA forms and comply with contract documents. A bid bond of 5% of the total bid amount is required.
On PublicBidSearch: the original bid posting, 9 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 10, 2026, 10:30 AM CT
- Time stated in bid documents
- Dec 10, 2026, 10:30 AM Central Time
- Bid bond
- 5%
- Performance bond
- Required
- Payment bond
- Required
- Submission
- electronic portal
- Documents analyzed
- 9 published · 5 analyzed
Scope of work
- Full-depth intermittent pavement repairs
- Striping of mainline pavement
- Maintenance of traffic
- Asphalt partial depth patching
Steps to Bid
- 1
Submit questions in writing to the Illinois Tollway. was Nov 18, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
Questions pertaining to the intent of the contract documents must be received no later than 2:00 p.m. local time on November 18, 2026, and sent to [email available with Pro].
- 2
Attend the optional pre-bid meeting. was Nov 9, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
An optional pre-bid meeting will be held via Microsoft Teams on November 9, 2026, at 2:00 p.m. Central Time (US & Canada).
What you'll need
Bid security
RequiredEach bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority.
Contract duration
All work under this contract shall be completed by May 1, 2028.
Award method
Award of the above contract, if any award be made, will be to the lowest responsive and responsible bidder or bidders.
Submission
Electronic portal
How to submit
All bids must be submitted electronically through BidBuy. Manual submissions in paper format or on electronic medium will not be accepted. Any information sent outside of BidBuy will neither be accepted nor considered. Submissions must be received through BidBuy on or before the time and date indicated in the Bid Opening section.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This is an Invitation for Bid (IFB) and all submissions must be electronic through BidBuy. The project is located systemwide in Cook County, DuPage County, Will County, Kane County, Lake County, McHenry County, Boone County, Winnebago County, DeKalb County, Ogle County, Lee County, and Whiteside County, Illinois.
Key dates
- Questions due
- Nov 18, 2026, 2:00 PM Central Time
- Pre-bid meeting
- Nov 9, 2026, 2:00 PM Central Time
- Bids due
- Dec 10, 2026, 10:30 AM CT
Documents
- attachment-notice-of-electronic-submission-only-v-23.1_7.pdf1 pages
- vendor-disclosure-formerly-forms-a-v27-1-2026-0624_11.docx
- ipg-active-registered-vendor-disclosure-formerly-forms-b-v-26-1-8-26-2025_4.docx
- RR-26-2069_Volume_I_10282026.pdf107 pages
- Affidavit-IL-BusinessBidPreference_v25.1_fillable_02112026_5.pdf1 pages
- RR-26-2069_VOSB-Facilitation_Form_.xlsx
- login
- rr-26-2069-systemwide-pavement-repairs
1 more file
More from this agency
- IFB Bulk Fuel · closes Dec 14, 2026
- RR-25-2034 - EWO #1 Offsetting CO #1 - ATP #1 - Systemwide Structural Rehabilitation · closes Dec 16, 2026
- Bridge Rehabilitation and Plaza Improvements, Rockton Road to Rock Cut Park Road, MP 2.6–10.3, Jane Addams Memorial… · closes Dec 17, 2026
- Plaza Improvements at Tri-State Tollway I-94 MP 18.7 to MP 22.0 (IL Route 22) and I-294 MP 48.5 to MP 49.3 (Willow Road) · closes Dec 18, 2026
- Ramp and Bridge Construction at IL 390 and I-490 Interchange · closes Dec 18, 2026
Similar bids in Illinois
- 30'x40'x14' Pole Barn with Concrete Floor Attached to Existing Tool Shed — Frankfort Township Road District · closes Dec 3, 2026
- Request for Proposals: Maintenance of County Highways and Various Road Districts (27-xx000-00-GM) · closes Dec 11, 2026
- May Road 138kV Interconnection 34.5kV 3000A Breaker Purchase — City of Peru, La Salle County, Illinois · closes Dec 3, 2026
- ROE #21 Franklin-Williamson County – Phase 1 Demolition: Pentecost Road
- 2027 Central Athletic Complex Stairs & ADA Ramp Project · closes Dec 16, 2026
Closing soon in Illinois
- Demolition of Threshing Barn & Restoration Project at North Branch - McConnell Farmstead · closes Nov 30, 2026
- Automated License Plate Reader · closes Dec 3, 2026
- East Avenue Park Fence Replacement · closes Dec 3, 2026
- Alternative Water Source Program (AWSP) Finished Water Transmission Main – Segment C · closes Dec 3, 2026
- I-25-4766 - CO #13 - ATP #18 - I-490 Roadway Construction · closes Dec 4, 2026