RRUMC 4th Floor Patient Care Reconfiguration – Electrical & Low Voltage Subcontract
University of California, Los Angeles — Capital ProgramsLos Angeles, California#907518.01 (BP 25)
The scope includes full electrical and low-voltage system upgrades across 67,400 square feet of the floor, with compliance to ADA, code, safety, and sustainability standards. The estimated cost is $20 million. The successful bidder will contract directly with DPR Construction, the CM at Risk. Bids must be submitted by 12:00 PM (PT) on November 30, 2026, to DPR Construction at 4665 MacArthur Court, Suite #100, Newport Beach, CA 92660. Bidding documents are available online via UCLA Capital Programs and the Autodesk Forma platform.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Nov 30, 2026
- Time stated in bid documents
- Nov 30, 2026, 12:00 PM Pacific Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 2 published · 1 analyzed
Scope of work
- Electrical and low-voltage system upgrades across 67,400 sq ft of 4th floor RRUMC
- Conversion of Behavioral Health to Medical/Surgical patient care spaces
- Reuse of existing infrastructure with full system upgrades
- Bid package estimated cost: $20,000,000
Steps to Bid
- 1
Access bidding documents via the UCLA Capital Programs website and the CM/Contractor’s Autodesk Forma platform (Official linkPro). was Oct 23, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit sealed bid to DPR Construction at 4665 MacArthur Court, Suite #100, Newport Beach, CA 92660, by 12:00 PM (PT) on November 30, 2026. by Nov 30, 2026, 12:00 PM
- 3
Ensure all required documentation, including bid bond and license verification, is included with the submission. by Nov 30, 2026, 12:00 PM
What you'll need
Insurance
RequiredThe successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour as of 10/1/17) and shall comply with all applicable federal, state and local working condition requirements.
Submission
Mail, Hand delivery
NAICS
238210
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
UCLA Health is reconfiguring the fourth floor of Ronald Reagan UCLA Medical Center (RRUMC) from Behavioral Health to Medical/Surgical use, expanding inpatient bed capacity to 103 beds. The project will renovate approximately 67,400 square feet of the 115,600 square foot fourth floor, including upgrades to electrical and low-voltage systems. The scope includes alteration, replacement, and system upgrades across the west, east, north, and south wings, with full compliance to ADA, code requirements, sustainability, safety, and security standards. The work will reuse much of the existing infrastructure while supporting acute care needs. The successful subcontractor will enter into a subcontract agreement directly with DPR Construction, A General Partnership, the CM at Risk contractor.
Key dates
- Bids due
- Nov 30, 2026
Documents
- 907518-01a_AdforBids_BP25_.pdf2 pages
- 907518-01b_AdforBids_BP25_.pdf
More from this agency
- RRUMC 4th Floor Patient Care Reconfiguration (BP 18b) - Wall Protection Subcontractor Bid — closes Nov 30, 2026
- RRUMC 4th Floor Patient Care Reconfiguration (BP 16) - Painting & Wall Covering Subcontractor Bid — closes Nov 30, 2026
- RRUMC 4th Floor Interior Signage Subcontract – UCLA Health — closes Nov 30, 2026
- RRUMC 4th Floor Patient Care Reconfiguration – Doors/Frames/Hardware Subcontract — closes Nov 30, 2026
- HVAC Subcontract for RRUMC 4th Floor Patient Care Reconfiguration — closes Nov 30, 2026
Similar open bids
- Tri-Annual Electrical Inspection — VETERANS AFFAIRS, DEPARTMENT OF
- Otay WTP Raw Water PS Switchboard Replacement — City of San Diego
- Installation of Electrical for SCADA Improvements — City of San Jacinto
- Safety Training Center Emergency Backup Generator — City of Carlsbad
- Civic Hall Rule 20B-UG Install Project — City of Delano
Closing this week nearby
- Custom Signs and Related Services — closes Nov 20, 2026
- 2027 Annual Pavement Rehabilitation Project – Professional Design Services RFP — closes Nov 20, 2026
- Background Investigative Services — closes Nov 20, 2026
- Emergency Generator Service and Repairs — closes Nov 21, 2026
- Consulting Services for Marketing & Public Information Strategy for the Housing Department — closes Nov 21, 2026