Regional School Unit 57 Synthetic Turf Field Replacement Project
Regional School Unit 57 (Waterboro)Waterboro, Maine
Regional School Unit 57 is seeking sealed bids for the complete removal and replacement of an existing synthetic turf field system in Waterboro, Maine. The project includes installing a new high-performance, multi-sport synthetic turf system with a shock-absorbing pad and sand infill. Key objectives include player safety, longevity, and minimizing environmental impact. The scope of work involves site preparation, supplying and installing the new turf system (including specific fiber type, pile height, face weight, backing, and infill specifications), testing, certification, and project management. Bids must be submitted on the completed Contractor Bid Form, along with a project approach, company qualifications, product specifications, cost proposal, certifications, and submittal schedule. A non-mandatory prebid meeting will be held on December 4, 2026. Bids are due by January 22, 2027, at 12:00 p.m. Bid security of 5% of the bid amount is required, and performance and payment bonds are required if the contract award exceeds $125,000.00.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 22, 2027
- Time stated in bid documents
- Jan 22, 2027, 12:00 PM Eastern Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Scope of work
- Remove and dispose of existing synthetic turf, infill, and base materials.
- Provide engineered shock pad layer (0.4-0.6 inches thick).
- Use clean, washed silica sand as primary infill (0.8-1.0 inches depth).
- Supply and install field markings, logos, and boundary lines per NFHS and NCAA specs.
- Conduct independent laboratory testing and provide third-party certification.
Steps to Bid
- 1
Bid Documents Available was Nov 23, 2026
This date has passed — confirm eligibility with the agency before bidding.
Bid Documents will be available on or about November 23, 2026.
- 2
Non-Mandatory Prebid Meeting by Dec 4, 2026, 11:00 AM
A non-mandatory prebid meeting will be held onsite at the RSU 57 Athletic Complex. Attendees must register in advance via email.
- 3
Questions Due (First Round) by Dec 16, 2026, 2:00 PM
- 4
Responses Issued (First Round) by Dec 18, 2026
- 5
Questions Due (Second Round) by Jan 6, 2027, 2:00 PM
- 6
Responses Issued (Second Round) by Jan 8, 2027
- 7
Bid Submission Deadline by Jan 22, 2027, 12:00 PM
Bids shall be submitted in sealed envelopes marked “RSU 57 Synthetic Turf Replacement Project” and delivered to Colin Walsh, CPA, Director of Finance and Operations, RSU 57, 86 West Road, Waterboro, ME 04087. No email bids will be accepted.
What you'll need
Contract duration
August 13, 2027
Submission
Mail, Hand delivery
How to submit
Bids shall be submitted in sealed envelopes marked “RSU 57 Synthetic Turf Replacement Project” and delivered to: Colin Walsh, CPA, Director of Finance and Operations, RSU 57, 86 West Road, Waterboro, ME 04087. No email bids will be accepted. RSU 57 assumes no responsibility for delays in mail or other delivery services. Bidders are strongly encouraged to use a reliable delivery service with tracking capabilities or to hand-deliver their bids to ensure receipt by the specified deadline.
In person/mail: Colin Walsh, CPA Director of Finance and Operations RSU 57 86 West Road Waterboro, ME 04087
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project will involve the installation of a new high-performance, multi-sport synthetic turf system, including a shock-absorbing pad and a stabilized sand infill, to ensure safety, durability, and performance for school and community athletic use. This is a public bid process conducted in accordance with Maine state procurement regulations. All contractors must comply with the terms, specifications, and milestone schedule outlined in this RFP. Key Objectives: Replace end-of-life turf with a modern, high-performance system; Ensure superior player safety, longevity, and playability; Minimize environmental impact and maintenance requirements; Complete construction within the critical path schedule. Supply & Installation of New Turf System: Turf Surface: Provide a high-performance, non-directional synthetic turf surface designed for multi-sport use (football, soccer, lacrosse, field hockey). Fiber Type: Dual-polymer (polyethylene/polypropylene) slit-film or monofilament fibers, UV-stabilized, with a minimum 8-year warranty against UV degradation and wear. Face Weight: Minimum 75 oz/yd². Backing: Multi-layer, reinforced, permeable polyurethane backing with dimensional stability and reinforcement for tuft bind. Fiber Tpe: Monofilament polyethylene (PE) with Pivot® structured yarns. Color: Field green with optional team/line markings integrated. Shock Pad Layer: Type: Engineered polyurethane (PU) or rubber shock pad. Thickness: 0.4 - 0.6 inches (depending on required shock absorption). Performance: GMAX at Installation: The completed synthetic turf system, including the shock pad and infill, shall achieve a maximum GMAX value of 100 at the time of installation and initial acceptance, as measured in accordance with ASTM F355. GMAX Throughout Warranty Period: The completed synthetic turf system shall maintain a maximum GMAX value not exceeding 130 throughout the warranty period, as measured in accordance with ASTM F355. Shock Absorption: ≥ 60% (per ASTM F1936 standards). Installation: Directly over compacted stone base; supplied in rolls or interlocking tiles. Infill System: Primary Infill: Clean, washed silica sand (round-grained, #16 to #30 grade), free of odors, organic materials, debris, and other foreign contaminants. Sand shall be suitable for use in synthetic turf athletic field systems and shall meet the turf manufacturer's specifications for gradation and performance. Infill Quantity: Approximately 6 - 8 lbs/ft² total, depending on final depth. Install anchor system, seam tapes, adhesives, and transitions. Perform final grooming, brushing, and infill conditioning. Testing & Certification: Conduct independent laboratory testing (ASTM standards) for Gmax, HIC, fiber properties, and infill compliance. Submit all test reports and warranties prior to final acceptance. Project Management & Documentation: Provide detailed submittals (product data, samples, warranties, installation plan). Coordinate with RSU 57 and their Owner’s Project Manager on daily progress. Clean site daily and maintain safe, secure work zones. Performance Requirements: FIFA Quality Pro or IAAF / World Athletics compliance (as required). Surface Elasticity: Controlled deformation for consistent ball roll and player traction (ASTM F2157). Abrasion Resistance: Meets ASTM D3884 standards for fiber durability. UV Stability: Tested for colorfastness and strength retention (≥ 5,000 kJ/m² exposure). Environmental: Lead-free, non-toxic materials; recyclable components. Installation Tolerances: Subgrade Tolerance: ±0.5 inches over 10 feet. Seam Alignment: ±0.25 inches. Infill Depth Variance: ±0.125 inches. Site Preparation: Level sub-grade with proper compaction. Shock Pad Installation: Lay rolls/tiles tightly; seal seams per manufacturer instructions. Turf Installation: Roll turf over shock pad; seam with adhesive or tape (min. 12-inch overlap). Infill Process: Apply primary sand infill evenly using drop spreaders. Power brush turf to upright fibers and distribute infill. Quality Checks: Verify evenness, seam integrity, and infill depth post-installation. Warranty: Minimum 8-year warranty on turf surface for UV, wear, and fiber integrity. Minimum 8-year warranty on shock pad for compression and impact attenuation. Minimum 5-year warranty on workmanship.
Key dates
- Questions due
- Jan 6, 2027, 2:00 PM Eastern Time
- Pre-bid meeting
- Dec 4, 2026, 11:00 AM Eastern Time
- Bids due
- Jan 22, 2027
- Expected award
- Feb 22, 2027
Documents
- RSU-57-Synthetic-Turf-RFP-11.23.2026-_1_.pdf64 pages
Similar bids in Maine
- Timber Stand Improvement and Tree Planting · closes Dec 30, 2026
- Lawn Mowing Services for Town Cemeteries, Municipal Garage, and Town Office Lawn · closes Jan 7, 2027
- Complete Removal and Replacement of Synthetic Turf Field System in Waterboro, Maine · closes Jan 22, 2027
- Erosion Control, Tree Removal, and Site Work Services at Landry Heights Site · closes Dec 18, 2026
- Cemetery Lawn Care and Grounds Maintenance Services · Boothbay Harbor · closes Dec 31, 2026
Closing soon in Maine
- W065--medical-grade oxygen cylinders/tanks · closes Nov 30, 2026
- Emergency Management Vehicle Upfits · closes Nov 30, 2026
- Live Haul Tank, Bob Tail Style, Double Wall Insulated, Aluminum · closes Nov 30, 2026
- Pre-Qualified Vendor List for Technical Assistance Materials · closes Dec 1, 2026
- Request for Proposal: Comprehensive Building Assessment of Prince Memorial Library, 266 Main Street, · closes Dec 4, 2026