Safety Significant Equipment Fabrications for the West Area Risk Management (WARM) Project
Hanford Tank Waste Operations & Closure, LLC (H2C)Richland, Washington#H2C-391118
Hanford Tank Waste Operations & Closure LLC (H2C), a prime contractor to the U.S. Department of Energy (DOE), Hanford Field Office (HFO), is the Integrated Tank Disposition Contractor (ITDC) at the Hanford Site. This Expression of Interest (EOI) is a means of conducting market research to identify parties having an interest in, and the resources to perform, build-to-print fabrication, assembly, testing, inspection, packaging, and delivery of Safety Significant (SS) Equipment Fabrication in suppo
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 16, 2026
- Time stated in bid documents
- Dec 15, 2026, 4:00 PM Pacific Time
- Documents analyzed
- 6 published · 1 analyzed
Scope of work
- Fabricate, assemble, test, inspect, package, and deliver Safety Significant (SS) Equipment.
- Support the West Area Risk Management (WARM) Project.
- Provide technical and quality documentation per SOW and supporting documents.
- Deliver SS Fabrications to 2355 Stevens Drive Warehouse, Hanford Site.
- Work scope includes 20 specific tasks such as riser adapter assemblies, jumpers, wall nozzles, valve gear operators, and monitoring systems.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The WARM project is necessary to provide treatment of the waste in SY Farm to allow for waste to be safely transported and grouted for long term storage. Equipment quality levels are either Safety Significant QL-2, or General Service QL-3. The future Subcontractor will have the ability to make design changes based on H2C construction installation needs via approved fabrication redline process. The future Subcontractor shall provide all labor, materials, equipment, and services necessary to fabricate, assemble, test, inspect, package, and deliver the WARM Safety Significant (SS) Fabrications to the Hanford Site. The future Subcontract will also supply the associated technical and quality documentation, in accordance with the Statement of Work (SOW) and supporting documents, specifications, and fabrication drawings. The future Subcontractor shall provide submittals in accordance with the Master Submittal Register (MSR), including procedures, certifications, qualifications, reports, and plans to H2C for approval. The work scope is broken into 20 tasks which include the following: PWST Riser Adapter Assemblies A, B, and C; Jumpers SY04A-WT-J-[1-2-3], SY04A-WT-J-[A-G-(3)-4], SY04A-WT-J-[E-F], SY04A-WT-J-[C-6], SY04A-WT-J-[D-7], SY04A-WT-J-[B-5], SY01A-WT-J-[H-K], SY01A-WT-J-[J-L], SYVPC-WT-J-[C6-C7]; Wall Nozzles SY-01A W/ Drain (2 right, 2 left), SY-04A PWST Wall Nozzles W/ Drain (2 right, 2 left), and SY-VPC Wall Nozzles (1 with left hand drain, 1 with no drain); Adapter, Shield Box and Piping Assemblies SY101-WST-RISER-022; Manual Valve Gear Operator assemblies (four 3-Way, and three 2-Way); PWST Vessel Exhaust Flow Monitoring Spool Assembly; and PWST Instrumentation Enclosure Fabrication. Task 20 involves testing and on-site support for the PWST Vessel Exhaust Flow Monitoring System. The Subcontractor shall hold a pre-fabrication conference with H2C prior to starting fabrication. Applicable standards include ASME B31.3-2022, ASME B&PVC Section IX – 2023, AWS D1.1-2020, AWS D1.6-2017, TFC-PLN-02, TFC-PLN-112, TFC-ENG-FACSUP-C-25, TFC-ENG-STD-12, and TFC-ENG-STD-22. Experience fabricating in accordance with AWS structural welding code, ASME welding/examination codes/specifications, and similar equipment is required. Personnel performing special processes shall be qualified in accordance with specifications and applicable codes. The Subcontractor shall have at least five years of successful experience fabricating in accordance with AWS Structural Welding Code and at least five years of experience fabricating in accordance with ASME welding/examination codes/specifications, with a minimum of 15 years’ experience with the fabrication and testing of similar equipment. The prospective Offerors shall demonstrate they have the shop and labor capacity to fabricate the WARM Waste Transfer Line to meet the delivery schedule. NAICS Code: 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing. The prospective Offerors shall have a fully implemented ASME NQA-1 2008 (including 2009 addendum) quality assurance program or be capable of meeting this requirement prior to contract award, and all work performed shall be based on the requirements of Title 10 of the Code of Federal Regulations, Part 830, Subpart A (10 CFR 830, Subpart A), Quality Assurance Requirements and DOE Order 414.1D, Quality Assurance. H2C anticipates issuing a Request for Proposal (RFP) in December 2027, with subcontract award in March 2027. Fabrication, testing, and delivery of all tasks outlined in the WARM SS Fabrications contract is anticipated to be completed by September 12, 2028.
Key dates
- Questions due
- Dec 8, 2026, 4:00 PM Pacific Time
- Bids due
- Dec 16, 2026
Documents
- 391118_EOI_WARM_SS_FAB.zip
- RELEASED.zip
- DRAFTS_1.zip
- DRAFTS_2.zip
- DRAFTS_3__2_.zip
- DRAFTS_4.zip
More from this agency
- Fabrication of LAW Melter Start-Up Heaters for the Waste Treatment and Immobilization Plant · closes Dec 1, 2026
- Hazardous Area Classification Review and Training Support · closes Dec 2, 2026
- Privacy Bathroom Design Services for Hanford Site, Richland, WA · closes Dec 2, 2026
- HANFORD TANK FARMS VADOSE GEOPHYSICAL LOGGING · closes Dec 7, 2026
- TX-Farm Corrugated Metal Pipe Covers – Subcontract for Hanford Site · closes Dec 17, 2026
Similar bids near Richland
- FABRICATION OF THE WASTE TRANSFER LINE FOR THE WEST AREA RISK MANAGEMENT (WARM) PROJECT · Richland · closes Dec 8, 2026
- LOT 2 BUBBLER ASSEMBLIES FOR HANFORD WTP LAW MELTER · Richland · closes Dec 8, 2026
- MITR Chemically Milled Plate Fabrication and Tooling · Richland · closes Dec 5, 2026
Closing soon near Richland
- Backflow Assembly Tester (BAT) Training at Hanford · Richland · closes Nov 30, 2026
- Switchboard · Richland · closes Dec 3, 2026
- AIHA Accredited IH Analytical Services · Richland · closes Dec 3, 2026
- DX & HX Expansion & Infrastructure Upgrade · Richland · closes Dec 3, 2026
- Hazardous Waste Packaging and Vermiculite · Richland · closes Dec 5, 2026