OpenRFPCloses Dec 1, 2026

Sale of Baled Post-Consumer Manifold Coloured Ledger (MCL)

Dept of the Army — W6CD USAG FT KNOXFort Knox, Kentucky#QRP27-0006

Bidders must provide a 53-foot van trailer and transport the material at their own cost. The QRP will assist with loading using a forklift. Pickup must occur within five working days of notification, during 8:00 A.M.–2:30 P.M. EST, Monday–Friday (excluding federal holidays). The winning bidder will be invoiced based on certified government scale weights. Payment is due within 45 days of pickup and must be made via bank draft, cashier’s check, certified check, traveler’s check, or postal money order. The deadline for submission is 12/01/26 at 2:00 P.M. EST. The QRP may reject any bid for non-conformance, prior misconduct, or failure to meet safety/environmental standards. A site visit to inspect the material is available upon request.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 1, 2026
Time stated in bid documents
Dec 1, 2026, 2:00 PM Eastern Time
Submission
email
Documents analyzed
1

Scope of work

  • Uncoated, groundwood-free, free of non-impact printing
  • QRP provides forklift and operator for loading assistance

Steps to Bid

What you'll need

Insurance

Required

The bidder agrees to conform to all state, federal, and local laws and regulations in the processing, sale, and disposal of materials received.

Submission

Email

NAICS

423930

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The load consists of approximately 40,000 lbs. The bidder must provide a 53-foot van trailer for pickup. The bidder is responsible for securing the load and transporting the material at their own expense. The bidder must inspect the material prior to acceptance; failure to inspect may constitute acceptance. 2962. The bidder must submit all required documentation (e.g., mill reports, photos) for product deductions within 30 days of pickup. The QRP reserves the right to reject any bid as non-responsive for reasons including non-conformance, prior failure to meet safety/environmental standards, or past misconduct. EST. A visit to inspect the material may be arranged by contacting the QRP during business hours (8:00 A.M.–3:00 P.M. EST, Mon–Fri, excluding federal holidays). The material is available for inspection until the end of the business day one day before the bid deadline.

Key dates

Questions due
Dec 1, 2026, 2:00 PM Eastern Time
Bids due
Dec 1, 2026

Documents

  • QRP_27-0006_28MCL_29_final.docx

See all documents · Download with Pro

More from this agency

Closing soon near Fort Knox