School Zone Flashing Beacon System Replacement
City of SpringfieldSpringfield, Missouri#024-2027RFP
The City of Springfield is seeking proposals for the replacement of school zone flashing beacon systems. The scope includes the purchase of 100 systems (75 solar-powered, 25 AC hardwired), with 12 of these also requiring speed feedback signs. All systems must include remote monitoring, scheduling, configuration, and speed data collection capabilities. Installation is excluded. A pre-proposal conference is scheduled for November 17, 2026, at 2:30 PM CST via videoconference. Bidders must register with Euna OpenBids (formerly DemandStar) to submit proposals. For contracts over $5,000, compliance with RSMo § 285.530 regarding unauthorized aliens and participation in a federal work authorization program (like E-Verify) is required.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026, 3:00 PM CT
- Time stated in bid documents
- Dec 2, 2026, 3:00 PM Central Time
- Submission
- electronic portal
- Documents analyzed
- 1
Scope of work
- All systems must be mountable on a 15 ft pole.
- Federal Buy America and domestic manufacturing requirements apply.
Steps to Bid
- 1
Register with Euna OpenBids (formerly DemandStar).
[link available with Pro]
- 2
Attend the pre-proposal conference. was Nov 17, 2026, 2:30 PM
This date has passed — confirm eligibility with the agency before bidding.
Videoconference. Email [email available with Pro] for link and password.
- 3
Submit questions in writing. by Nov 24, 2026, 12:00 PM
Submit to the Buyer.
- 4
Upload proposals electronically to Euna OpenBids. by Dec 2, 2026, 3:00 PM
[link available with Pro]
What you'll need
Submission
Electronic portal
How to submit
Proposals must be received electronically in the City’s e-bidding service provider Euna OpenBids (formerly DemandStar) by 3:00 P.M. (CST), on December 2, 2026. Hand delivered, faxed, or emailed proposals will not be accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The City of Springfield is requesting proposals for the purchase of school zone flashing beacon systems to replace its existing equipment. The systems should be remotely monitored, scheduled, configured, and managed over cellular or satellite communications, with continuous speed data collection accessible from a remote software platform. The procurement covers one hundred (100) locations: seventy-five (75) solar-powered and twenty-five (25) AC hardwired. Nine (9) solar and three (3) AC locations will also include a speed feedback sign system. All 100 locations require continual speed monitoring functionality with remotely accessible data. All systems must be mountable on a 15 ft tall aluminum pole with an 18 in. base. The proposal must include dual 12 in. flashing yellow beacons, solar panels and batteries (at solar locations), system controllers, controller/battery cabinets, internal wiring, mounting hardware, remote management software, cellular/satellite connectivity hardware, stealth speed monitoring and recording components, and supplemental speed feedback signs at 12 designated locations. Equipment must have a minimum two-year manufacturer warranty. Excluded items are signage, poles, foundations, bases, installation labor, traffic control, field wiring, and AC electrical service. Systems must operate in -20 F to 165 F and comply with MUTCD, 11th Edition. The software platform must support remote scheduling, configuration, and diagnostics for all deployed systems, with group scheduling and 50+ user accounts. Local connectivity via Bluetooth or Wi-Fi is required. Speed monitoring should be schedulable and remotely accessible. Speed feedback signs must have a minimum 12-inch character height and not exceed 30 inches in total height. Solar-powered locations must maintain full operation with 7 days of no-charge autonomy at 50% battery depth of discharge. This procurement uses federal-aid funds and requires Buy America compliance, domestic manufacturing, and adherence to federal contract provisions under 2 CFR 200 Appendix II.
Key dates
- Questions due
- Nov 24, 2026, 12:00 PM Central Time
- Pre-bid meeting
- Nov 17, 2026, 2:30 PM Central Time
- Bids due
- Dec 2, 2026, 3:00 PM CT
- Expected award
- Dec 16, 2026
Documents
- BID_20024-2027RFP.pdf62 pages
More from this agency
- Tennis Court Repair and Maintenance — closes Nov 23, 2026
- Liquid Aluminum Sulfate Supply Contract — closes Nov 30, 2026
- Asset Management Plan – Springfield-Greene County Parks — closes Dec 1, 2026
- Basketball League Administrator — closes Dec 3, 2026
- Southwest Wastewater Treatment Plant Centrifuge Replacement — closes Dec 3, 2026
Similar open bids
- Parapet Flashing Installation — Greene County
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026