Sealed Bids: Colina Vista Water Main Replacement PROJECT CIP
Oak Lodge Water Servicescolina Vista Water Main ReplacementOregon
The project is estimated to cost between $3.2M and $3.6M. Bids must be submitted electronically via Bid Locker by 2:00 PM PST on December 17, 2026.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 17, 2026
- Time stated in bid documents
- Dec 17, 2026, 2:00 PM Pacific Time
- Submission
- electronic portal
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Replace 8,600 feet of cast iron water main with ductile iron pipe
- Install valves, meters, and fittings along SE Colina Vista Ave
- Connect to side streets and existing infrastructure
- Submit bid via electronic portal by 2:00 PM PST, December 17, 2026
Steps to Bid
- 1
Review the full contract documents at Official linkPro
- 2
Submit a sealed bid through the Bid Locker system by 2:00 PM PST on December 17, 2026 by Dec 17, 2026, 2:00 PM
What you'll need
Submission
Electronic portal
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The work includes replacement of approximately 8,600 feet of cast iron water pipe with ductile iron pipe, along with associated fittings, valves, meters, and connections on SE Colina Vista Ave and adjacent side streets. The engineer's estimate for the project is between $3,200,000.00 and $3,600,000.00. Bids must be submitted via the Bid Locker system at [link available with Pro]. All bids must be submitted in the prescribed form using the furnished Bid Submission packet. Late submissions will be rejected.
Key dates
- Bids due
- Dec 17, 2026
Similar bids in Oregon
- City of Brookings - Collis and Barclay Lane Water Line Improvements · closes Dec 8, 2026
- Colina Vista Water Main Replacement · closes Dec 17, 2026
- Bryant Woods Water Main Replacement Project · Lake Oswego · closes Jan 6, 2027
- City of Elkton, Water Distribution Improvements · Elkton · closes Dec 15, 2026
- WL-26-02, 34th Avenue Water Line Cathodic Improvements · Albany · closes Dec 1, 2026
Closing soon in Oregon
- Design and Construction Services for Highway 212 Transmission Pipeline · closes Dec 2, 2026
- 2026 Region 2 VMS Replacements — Linn and Marion Counties · closes Dec 3, 2026
- 2026-2027 Project Work RFP – Astoria, Forest Grove and Tillamook Districts · closes Dec 3, 2026
- ODOT Notice to Contractors NTC-2: Multiple Highway and Bridge Construction Projects · closes Dec 4, 2026
- RFP for NCQA-Certified HEDIS Measurement Vendor · closes Dec 4, 2026