Construction of 0.181 Miles of Bridge & Approaches on CR 547, Project No. SAP-42(69), Leflore County, Mississippi
Board of Supervisors of Leflore CountyMississippi#124-20261007105254 BSLC
The Leflore County Board of Supervisors is soliciting sealed bids for the construction of a 0.181-mile bridge and approaches on CR 547 (Project No. SAP-42(69)). Scope includes prestressed concrete beams, piling, bridge concrete, guard rail, erosion control, excavation, and traffic management. Work must be completed in 90 working days. Bids must be received by 3:00 PM on November 23, 2026, at the Leflore County Courthouse, Greenwood, MS. A 5% bid bond is required. Plans and specs are available at the Chancery Clerk’s office, LSBP Engineer’s office, and State Aid Engineer’s office. Electronic submissions accepted via [link available with Pro].
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 23, 2026, 3:00 PM CT
- Time stated in bid documents
- Nov 23, 2026, 3:00 PM Central Time
- Bid bond
- 5%
- Submission
- mail, hand delivery, electronic portal
- Documents analyzed
- 1
Scope of work
- Construct 0.181 miles of bridge and approaches on CR 547
- Install 31' and 40' prestressed concrete beams
- Install 18” and 24” preformed pile holes
- Construct bridge concrete (Class A)
- Install guard rail (W-beam and bridge end sections)
- Provide erosion control (geotextile, silt fences, wattles)
Steps to Bid
- 1
Register and purchase bid documents at Official linkPro. A valid email is required for registration.
- 2
Submit questions to Plan House Printing at (662)407-0193 for issues with website registration or online orders. was Nov 16, 2026, 3:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit sealed bid by 3:00 PM on November 23, 2026, at the Leflore County Courthouse, Greenwood, Mississippi. by Nov 23, 2026, 3:00 PM
- 4
Ensure bid is accompanied by a certified check or bid bond for 5% of the total bid amount, payable to Leflore County and the State of Mississippi. by Nov 23, 2026, 3:00 PM
- 5
Submit electronic bid via Official linkPro if using the online portal. by Nov 23, 2026, 3:00 PM
What you'll need
Contract duration
90 working days from notice to proceed
Submission
Mail, Hand delivery, Electronic portal
NAICS
237130
How to submit
Bids must be sealed and submitted in person or by mail to the Leflore County Courthouse, Greenwood, MS. Electronic submissions are accepted via Official linkPro. All bids must include a 5% bid bond or certified check payable to Leflore County and the State of Mississippi.
In person/mail: Leflore County Courthouse, Greenwood, Mississippi
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes full bridge construction with prestressed concrete beams (31' and 40'), reinforced concrete piling, bridge concrete (Class A), reinforcement, concrete railing, loose riprap (300 lb.), and approach work including excavation, granular material (LVM, Class 4, GP.B), 48” reinforced concrete pipe (Class III), guard rail (W-beam and bridge end sections), erosion control (geotextile under riprap, silt fences, wattles, excelsior blankets), clearing and grubbing, removal of existing bridge and pipe, and traffic control. Work also includes surveying, right-of-way markers (Type II), temporary signs, and maintenance of traffic. A bid bond of 5% of the total bid amount, made payable to Leflore County and the State of Mississippi, is required. Bidders must register and purchase documents through the website.
Key dates
- Questions due
- Nov 16, 2026, 3:00 PM Central Time
- Bids due
- Nov 23, 2026, 3:00 PM CT
Documents
- document2 pages
Similar open bids
- Concrete Repair (Seal & Overlay) of US 72 from SR 25 to Alabama State Line, and Bridge Repair on US 72 over MS 25… — Mississippi Department of Transportation
- Bridge Preventive Maintenance on US 61, US 51, and MS 3 — Mississippi Department of Transportation
- Bridge Repair on I-55 over CNIC Railroad (Bridge Nos. 40.3A & 40.3B) — Mississippi Department of Transportation
- Overlay approximately 6.6 miles of US 11 from the north abutment of the Leaf River Bridge to the Jones County Line,… — Mississippi Department of Transportation
- Bridge Installation and Bridge Components — Term Contract, January 1, 2027, through December 31, 2027 — Rankin County Board of Supervisors
Closing this week nearby
- 2024502 Lee County Adult Detention Center – Phase II RE-BID Building Bid Package I-E (General Works, Finishes, &… — closes Nov 17, 2026
- ITSS 497 - Start Up Space Catalyzer, ITSS 499 - Merit Pages Platform, ITSS 500 - Parchment Diploma Services, ITSS 501… — closes Nov 17, 2026
- Invitation to Bid: SCBA Breathing Air Cascade Fill Station — closes Nov 17, 2026
- 2024502 Lee County Adult Detention Center - Phase II REBID (I-N Finishes) — closes Nov 17, 2026
- 2024502 Lee County Adult Detention Center - Phase II REBID (I-P Openings) — closes Nov 17, 2026