OpenIFBCloses Dec 15, 2026, 2:00 PM CT

Secondary Clarifier Battery 5 RAS Valves Replacement at South Shore Water Reclamation Facility

Milwaukee Metropolitan Sewerage District — Office of Contract ComplianceMilwaukee, Wisconsin#S06049C10

Work must be completed during a single 120-hour service outage between June and October. Bidders must submit electronic bids via QuestCDN by 2:00 p.m. local time on December 15, 2026. A site tour is scheduled for December 8, 2026, at 9:00 a.m. at the Administration Building Lobby, requiring pre-registration. A pre-bid presentation was posted by November 27, 2026. The contract requires compliance with SBE participation (20% of contract value), Local Workforce Participation (45% of hours by SSSA workers, 20% by Target Area workers), and Apprenticeship Utilization (10% of labor hours by apprentices, with 40% of required hours from approved pre-apprenticeship programs). The contract duration is 300 calendar days from the Notice to Proceed. The District is exempt from Wisconsin Sales and Use Tax on materials and equipment. The contract is managed through Trimble (formerly e-Builder).

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 15, 2026, 2:00 PM CT
Time stated in bid documents
Dec 15, 2026, 2:00 PM Central Time
Submission
electronic portal
Contract term
300 calendar days from the Notice to Proceed
Documents analyzed
3 published · 2 analyzed

Scope of work

  • Replace 4 x 20-inch knife gate valves and 4 x 12-inch knife gate valves
  • Perform functional and 7-day operational acceptance tests
  • Coat non-stainless-steel components and reducing elbows

Steps to Bid

  1. 1

    Register on Official linkPro and purchase the Contract Documents for $42.00 to become a Plan Holder. This is required for access to addenda and updates.

  2. 2

    View the pre-bid presentation posted on the MMSD website and QuestCDN by 5:00 p.m. on November 27, 2026. by Nov 27, 2026, 5:00 PM

  3. 3

    Submit the bid electronically via QuestCDN at Official linkPro by 2:00 p.m. local time on December 15, 2026. by Dec 15, 2026, 2:00 PM

What you'll need

Contract duration

300 calendar days from the Notice to Proceed

Submission

Electronic portal

NAICS

238290

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The set includes four 20-inch knife gate valves and four 12-inch knife gate valves that control the flow of return activated sludge (RAS) from secondary clarifiers battery #5. The contractor shall disconnect and remove the eight existing valves, disconnect, surface prep, and coat four reducing elbows and side-outlet elbows, coat non-stainless-steel components of the new valves, install eight new knife-gate valves with new stainless steel hardware, reassemble the RAS piping, perform a functional test, and complete a 7-day operational acceptance test. Bids must be submitted electronically via Quest Construction Data Network (QuestCDN) by 2:00 p.m. local time on December 15, 2026. The District will only accept electronic bids through QuestCDN. A site tour is scheduled for December 8, 2026, at 9:00 a.m. at the Administration Building Lobby, 8500 5th Avenue, Oak Creek, WI 53154. The contract is managed through Trimble (formerly e-Builder), a web-based project and contract management system.

Key dates

Pre-bid meeting
Nov 27, 2026, 5:00 PM Central Time
Site visit
Dec 8, 2026, 9:00 AM Central Time
Bids due
Dec 15, 2026, 2:00 PM CT

Documents

  • S06049C10_Invitation_to_Bid_20261113110604_1654.pdf3 pages
  • d.asp
  • S06049C10_Pre-Bid_Presentation_Slide_Deck_20261116142844_3480.pdf24 pages

See all documents · Download with Pro