OpenIFBCloses Dec 15, 2026

Annex Building Roof Replacement at Southeast Guilford High School

Guilford County SchoolsNorth Carolina#6863

A mandatory pre-bid conference is scheduled for November 30, 2026, at 10:00 AM at the school’s front office. Roof access and core cuts are required prior to bid opening. A 5% bid security, 100% performance bond, and 100% labor and material payment bond are required. The project requires E-Verify compliance. The Board reserves the right to reject all bids.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 15, 2026
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
1

Scope of work

  • Replace 25,000 sq ft of existing BUR roof with new PVC membrane assembly
  • Perform core cuts and site inspections prior to bid opening
  • Comply with E-Verify requirements for all personnel

Steps to Bid

  1. 1

    Register with the GCS Project Manager before accessing the roof for site inspection. by Before bid opening

  2. 2

    Review plans and specifications available at Official linkPro beginning November 23, 2026. was Nov 23, 2026

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Mail, Hand delivery

NAICS

236220, 236221

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Bids will be publicly opened and read aloud immediately thereafter. The work includes replacing approximately 25,000 square feet of existing built-up roof (BUR) with a new PVC membrane roof assembly, including all associated labor, materials, and site work. Attendees must meet and sign in at the Front Office, 4530 SE School Rd, Greensboro, NC 27406. Prior to the bid opening, all roofing contractors must visit the roof, examine existing conditions, and perform core cuts. Contractors must register with the GCS Project Manager before accessing the roof. Bids may not be withdrawn for 60 days after the closing time. Plans and specifications are available electronically at [link available with Pro] beginning November 23, 2026.

Key dates

Pre-bid meeting
Nov 30, 2026, 10:00 AM Eastern Time
Site visit
Nov 30, 2026, 10:00 AM Eastern Time
Bids due
Dec 15, 2026

Documents

  • SEHSAdforBidsAnnexReRoof.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar bids in North Carolina

Closing soon in North Carolina