OpenIFBCloses Dec 3, 2026

Sequoia High School Stadium Lights Replacement

Sequoia Union High School District — Facilities/ConstructionRedwood City, California#27-1193C

The Sequoia Union High School District is seeking bids to replace the stadium lights at Sequoia High School. The work includes removal of existing fixtures and installation of new LED lighting, electrical systems, and controls. The project is located at 1000 El Camino Real, Redwood City, CA. A pre-bid meeting is scheduled for 10:00 AM PT on November 19, 2026. Questions may be directed to Roberto Bautista-Gatica.

On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 3:00 PM Pacific Time
Submission
mail, hand delivery

Scope of work

  • Install new electrical wiring and conduit
  • Provide control system for lighting operation
  • Remove and dispose of old lighting equipment

Steps to Bid

  1. 1

    Register with the Sequoia Union High School District procurement portal (if required).

  2. 2

    Attend the pre-bid meeting on November 19, 2026, at 10:00 AM PT. was Nov 19, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit a bid proposal by 3:00 PM PT on December 3, 2026. by Dec 3, 2026, 3:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

541810

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The contact for questions is Roberto Bautista-Gatica, email [email available with Pro], phone 650-369-1411 x22294.

Key dates

Pre-bid meeting
Nov 19, 2026, 10:00 AM Pacific Time
Bids due
Dec 3, 2026

More from this agency

Similar bids near Redwood City

Closing soon near Redwood City