OpenConstructionCloses Dec 16, 2026

SH 3, Middle Fork Potlatch Creek Bridge to Bottom of Bear Ridge

Idaho Transportation Department — ITDLatah, Idaho#22208

Scope includes removal of existing signage, guardrail, and miscellaneous items; shoulder grading and aggregate placement; guardrail installation (W-beam); sidewalk and driveway reconstruction; pavement marking and rumble strip installation; temporary traffic control; and erosion control. Bids are expected to be opened in December 2026. The work is classified as RESRF/RESTO&REHAB.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 16, 2026
Time stated in bid documents
Dec 15, 2026, 11:59 PM Mountain Time
Submission
mail, hand delivery
Contract term
3 years + Two additional one-year renewal terms
Documents analyzed
1

Scope of work

  • Rehabilitate Middle Fork Potlatch Creek Bridge on SH 3
  • Resurface 2.3 miles of SH 3 from bridge to bottom of Bear Ridge
  • Install 5,481 feet of W-beam guardrail
  • Reconstruct 422 square yards of sidewalk and driveway
  • Install 328.56 square feet of new signage and 292.5 feet of steel sign posts
  • Mark 314,457.80 feet of pavement with waterborne markings

Steps to Bid

  1. 1

    Review the full bid documents, including the bid items list, specifications, and drawings.

  2. 2

    Submit any questions to Kyle Monson via email by November 17, 2026. was Nov 17, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Attend the pre-bid meeting on November 17, 2026, at 10:00 AM MT at the ITD District 2 office in Moscow, Idaho. was Nov 17, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Mail, Hand delivery

NAICS

237130

How to submit

Submit one original and one electronic copy on a USB drive inside a sealed envelope. The envelope must be marked with the bid number 22208 and the date of submission.

In person/mail: Idaho Transportation Department, District 2, 1000 N. 4th Street, Moscow, ID 83843

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Construction work on State Highway 3 from Middle Fork Potlatch Creek Bridge to the bottom of Bear Ridge in Latah County, Idaho. Scope includes full bridge rehabilitation and roadway reconstruction. The project also includes installation of new steel sign posts, sign brackets, and braces; replacement of manhole and valve covers; and cold milling of existing pavement. A contingency amount is included for miscellaneous erosion and work control.

Key dates

Pre-bid meeting
Nov 17, 2026, 10:00 AM Mountain Time
Bids due
Dec 16, 2026

Documents

  • 90-Day_Contracts_Bidding_Look_Ahead.pdf2 pages

See all documents · Download with Pro

More from this agency

Closing soon near Latah County