OpenRFPCloses Nov 30, 2026, 2:00 PM CT

Shady Creek Ranger Facility - Construction Supplies

Dept of the Army — W07V ENDIST ROCK ISLANDIowa#W912EK27QA004

The U.S. Army Corps of Engineers is seeking bids for construction supplies and services for the Shady Creek Ranger Facility in Muscatine, IA. The scope includes structural lumber, sheathing, trusses, insulation, garage doors, and a roll-off dumpster. All items must be delivered to 3550 Highway 22, Muscatine, IA 52761, by 30 April 2027. Technical questions are due by 2:00 PM CT on 23 November 2026. Quotes are due by 2:00 PM CT on 30 November 2026. All personnel must pass background checks. Invoices must be submitted monthly via email.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 30, 2026, 2:00 PM CT
Time stated in bid documents
Nov 30, 2026, 2:00 PM Central Time
Bid bond
5%
Submission
email
Contract term
12 months + Two additional 12-month renewal terms
Documents analyzed
3

Scope of work

  • Supply and deliver structural lumber (2x6, 2x8, 2x12, 2x14, 2x16, 2x20) and pressure-treated lumber
  • Supply and install Huber Zip System or equivalent sheathing and underlayment
  • Supply and install 43 common and 2 gable roof trusses (4/12 pitch, 30ft span, 17” heel height)
  • Supply and install 5,500 sq. ft. of 7 ¼” mineral wool batt insulation (R49–R60)
  • Supply and install two 10’ x 10’ insulated steel overhead garage doors (R-17, 2” thick, galvanized steel)
  • Supply and service a 20-yard roll-off dumpster (up to four dumps)

Steps to Bid

  1. 1

    Register in SAM and ensure active status.

  2. 2

    Submit technical questions via email to Bradley J. Grothus at [email available with Pro] by 2:00 PM CT on 23 November 2026. by Nov 23, 2026, 2:00 PM

  3. 3

    Review the attached Detailed Price Breakdown - CLIN 0001 and complete the pricing for all line items.

  4. 4

    Ensure all required documents are submitted by the due date. by Nov 30, 2026, 2:00 PM

What you'll need

Submission

Email

NAICS

321911

How to submit

Submit completed quote via email to [email available with Pro]. Include the completed Detailed Price Breakdown - CLIN 0001 as an attachment. All submissions must be received by 2:00 PM CT on 30 November 2026. The solicitation form must be signed and returned to the issuing office.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The U.S. Army Corps of Engineers, Rock Island District, Mississippi River Project Office, requires the purchase and delivery of various construction supplies and services for the Shady Creek Ranger Facility. The scope includes: (1) Supply and delivery of construction materials as detailed in the attached Excel worksheet (CLIN 0001), including structural lumber (2x6, 2x8, 2x12, 2x14, 2x16, 2x20), pressure-treated lumber, LVL beams, wall and roof sheathing (Huber Zip System or equivalent), trusses (4/12 pitch, 30ft span, 17” heel height, 24” on center, 24” overhang), underlayment, flashing, and fasteners; (2) Supply and installation of 5,500 sq. ft. of 7 ¼” mineral wool batt or equivalent insulation in walls and ceiling (R49–R60), with no spray foam or fiberglass batts allowed; (3) Supply and installation of two 10’ x 10’ insulated steel overhead garage doors (tan, with one row of windows, 2” thick panels, R-17, galvanized steel skin ≥0.015” thick with fluoropolymer coating, heavy-duty springs, 3” track, electric opener, remote controls); (4) Supply and service of a 20-yard roll-off dumpster, serviced up to four times. All materials must be delivered to Shady Creek Recreation Area, 3550 Highway 22, Muscatine, IA 52761, with delivery completed no later than 30 April 2027. All lumber must be structural grade #2 or better. Trusses must be approved prior to fabrication. The contractor shall provide all personnel, equipment, tools, and supervision. Invoicing must be submitted monthly via email to [email available with Pro]. The Government reserves the right to reject any product that does not meet specifications. Security requirements apply: all contractor personnel must undergo background checks via NCIC-III and TSDB; access to USACE facilities is contingent on approval. Contractors must comply with E-Verify and provide a list of verified employees within three business days of award. Waivers for denied access are possible but require a formal request to the District Commander.

Key dates

Questions due
Nov 23, 2026, 2:00 PM Central Time
Bids due
Nov 30, 2026, 2:00 PM CT

Documents

  • B08_W912EK27QA004.pdf30 pages
  • B08_J-0001_Detailed_Price_Breakdown_CLIN_0001.xlsx
  • B08_J-0002_Image_One_Shady_Creek_Rec_Area_Locator_Map.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby