Shoreline Stabilization at Twin Lakes State Park, Calhoun County, Iowa
Dept of Natural ResourcesTwin Lakes, Iowa#27-02-13-01
The scope includes clearing and grubbing vegetation, placing 400 tons of native field stone along 550 feet of shoreline, constructing a stabilized construction entrance, installing boulders along the park perimeter, and site restoration. The project must be completed by May 15, 2027. A 100% performance bond is required. The contractor must obtain a NPDES Stormwater Discharge Permit (DNR General Permit No. 2) prior to work commencement.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 10, 2026, 3:00 PM CT
- Time stated in bid documents
- Dec 10, 2026, 3:00 PM Central Time
- Performance bond
- 100%
- Submission
- Contract term
- 120 calendar days from notice to proceed
- Documents analyzed
- 2
Scope of work
- Construct 50'x20' stabilized construction entrance
- Install 50 boulders (3'x3'x3' min) at 65-inch spacing
- Replace storm drain outlet pipe along beach edge
- Restore site with seeding and mulching using Iowa DOT mix
Steps to Bid
- 1
Review the full bid package, including plans, specifications, and instructions to bidders.
- 2
Attend the site visit to inspect actual job conditions prior to bidding.
- 3
Submit all questions to Heath Delzell, District 2 Engineer, by the deadline specified in the bid package.
- 4
Complete and sign the Proposal Form (Attachment A) and include all required documentation.
- 5
Submit the proposal electronically to [email available with Pro] with the subject line: 'Shoreline Stabilization, 27-02-13-01, 12/10/2026'. by Dec 10, 2026, 3:00 PM
What you'll need
Submission
NAICS
237130, 237990
How to submit
Submit proposal electronically to [email available with Pro]. Include the subject line: 'Shoreline Stabilization, 27-02-13-01, 12/10/2026'. All proposals must be submitted electronically. No paper proposals will be accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This project includes clearing and grubbing of trees, shrubs, and brush, and placing 400 tons of native field stone along 550 feet of shoreline at Twin Lakes State Park. The contractor must verify site conditions, avoid disturbing existing utilities, and comply with all applicable codes and ordinances.
Key dates
- Bids due
- Dec 10, 2026, 3:00 PM CT
Documents
- 27-02-13-01_-_Plans.pdf7 pages
- 27-02-13-01_-_Bid_Package.pdf10 pages
More from this agency
- Slide Repair, Springbrook State Park, Guthrie County · closes Dec 17, 2026
- Roadway Construction, Lake Keomah State Park, Mahaska County · closes Dec 17, 2026
- Dam Stabilization at Red Haw State Park, Lucas County, Iowa · closes Dec 17, 2026
- Twelve Mile Lake Water Control Structure and Piping Installation · closes Dec 17, 2026
- Restoration - Phase 2 In-Lake Work, Diamond Lake, Poweshiek County · closes Dec 17, 2026
Closing soon near Twin Lakes
- East Main Tile Repair · Algona · closes Dec 1, 2026
- Grant Administration Services for Downtown Streetscape Project · Eagle Grove · closes Dec 2, 2026
- Construction of Emergency Generators at Four Locations in Holstein, Iowa · Holstein · closes Dec 3, 2026
- 2027 City of Odebolt Southeast Watermain Improvements Project · Odebolt · closes Dec 3, 2026
- 2027 City of Odebolt Southeast Water Main Improvements Project – Notice of Public Hearing and Letting · Odebolt · closes Dec 3, 2026