Sidewalk Replacement - Various Locations
City of SedaliaSedalia, Pettis, Missouri#IFB 2027-007
The City of Sedalia is soliciting bids for sidewalk replacement, ADA ramp construction, and curb and gutter work at various locations. The project involves approximately 51,229 square feet of sidewalk and 81 ADA ramps. A bidder's bond of 5% of the total bid amount is required. The successful bidder must obtain a City of Sedalia Contractor's License and comply with Missouri Prevailing Wage laws. Performance and payment bonds, each for 100% of the contract price, will be required after award. The project duration is 120 calendar days from the Notice to Proceed, with potential for four one-year extensions. Bidders must also comply with federal work authorization requirements and anti-boycott provisions related to Israel. Questions are due by December 1, 2026.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 15, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 15, 2026, 2:00 PM Central Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- One year + up to four (4) additional one-year terms upon written notice to the Contractor and acceptance of such extension by the Contractor.
- Documents analyzed
- 1
Scope of work
- Remove and replace approximately 51,229 sq ft of sidewalk.
- Replace curb and gutter.
- Perform all incidental and related work for a complete project.
- Comply with Missouri Prevailing Wage Act and potentially Davis Bacon Act.
Steps to Bid
- 1
Obtain digital copies of Plans, Specifications, and Contract Documents from Official linkPro or by contacting Elizabeth Nations.
- 2
Submit all questions in writing to Elizabeth Nations via email. by Dec 1, 2026, 4:00 PM
- 3
Review responses to questions, which will be sent by December 3, 2026. by Dec 3, 2026, 4:00 PM
- 4
Prepare and submit proposal on printed forms in a sealed envelope marked "2027-007 SIDEWALK REPLACEMENT-VARIOUS LOCATIONS" with bidder's name. by Dec 15, 2026, 2:00 PM
A bidder's bond for 5% of the total amount of the bid must accompany each proposal.
What you'll need
Bid security
RequiredThe successful bidder shall furnish to the City a payment bond with good and sufficient sureties to cover 100% of the contract price. Additionally, the successful bidder shall provide the City a performance bond to cover 100% of the cost of the entire construction contract.
Contract duration
120 calendar days from the date of the Notice to Proceed
Award method
The City reserves the right to reject any or all bids and waive any irregularities in the bids.
Submission
Mail, Hand delivery
How to submit
Proposals shall be submitted in a sealed envelope marked on the outside “2027-007 SIDEWALK REPLACEMENT-VARIOUS LOCATIONS” with name of bidder.
In person/mail: Office of the City Clerk in the Municipal Building
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Digital copies of documents are available on the City's website or by contacting Elizabeth Nations. Questions must be submitted in writing by December 1, 2026, with responses due by December 3, 2026. Proposals must be submitted on printed forms in a sealed envelope marked with the bid number and bidder's name. No bidder may withdraw their bid for sixty (60) days after the bid opening. The City reserves the right to reject any or all bids and waive irregularities. Monthly payments will be made for completed work based on unit prices. The contractor shall provide marked-up plans for as-built drawings prior to final payment. The project is subject to Missouri State Sales Tax Exemption provisions for materials incorporated into the project. The successful bidder must also affirm enrollment in a federal work authorization program (e.g., E-Verify) and affirm they do not knowingly employ unauthorized aliens. Additionally, contractors must not engage in a boycott of goods or services from the State of Israel. The contract may be extended for up to four (4) additional one-year terms at the City's option. A maintenance guarantee bond for one year is also required. The contractor must perform at least 30% of the total original contract price with their own organization.
Key dates
- Questions due
- Dec 1, 2026, 4:00 PM Central Time
- Bids due
- Dec 15, 2026, 2:00 PM CT
Documents
- 1110_2026-IFB-2027-007-SIDEWALK-REPLACEMENT-VARIOUS-LOCATIONS-FINAL.pdf149 pages
More from this agency
- Installation of 3 Phase Electrical Service for Glass Pulverizer at City of Sedalia Material Management Site — closes Nov 23, 2026
- Sedalia School District - Smith Cotton Junior High Flooring Replacement — closes Dec 2, 2026
- Rock Material Procurement for City of Sedalia Public Works — closes Dec 10, 2026
Similar open bids
- ADA Improvements at 9 Locations in St. Louis District — Missouri Department of Transportation
- Instructor Services for Foundations of Performance Accountability Training — Missouri Department of Health and Senior Services
- Courthouse Annex Foundation Drains Construction — Lewis County Monticello
- New Ballas Sidewalk Project – Phase 3 — City of Creve Coeur
- New Ballas Sidewalk Project - Phase 3 TAP-5561(612) — City of Creve Coeur
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026