Overhead Sign Structure Replacement on I-70, Wyandotte County, Kansas
Kansas DOT — Bureau of Construction & MaterialsKansas#526126131
The work includes removal of the existing truss and sign supports, construction of a new drilled shaft foundation, fabrication and installation of a new steel truss sign structure, and installation of new sign panels. The structure is designed per AASHTO LRFD Specifications and KDOT Special Provisions. The new structure will be fabricated from API-5L-X42 PSL2 or ASTM A500 steel pipe, with ASTM A709 Grade 36 steel plates and angles. All bolts, nuts, and washers will be galvanized per ASTM A153. The structure will be welded per AWS D1.1. The sign panels will be standard KDOT panels, with Type IV high-intensity retroreflective sheeting.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 16, 2026, 1:00 PM CT
- Time stated in bid documents
- Dec 16, 2026, 1:00 PM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 2 published · 1 analyzed
Scope of work
- Fabricate and install new steel truss sign structure
- Implement traffic control measures during construction
Steps to Bid
- 1
Register with KDOT's e-procurement system (KDOTApp) and obtain a vendor ID.
- 2
Review the full bid package, including plans, specifications, and special provisions.
- 3
Submit any questions to the KDOT contact by the deadline of November 13, 2026, at 1:00 PM CT. was Nov 13, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Attend the pre-bid meeting on November 13, 2026, at 1:00 PM CT, at the KDOT Bonner Springs office. was Nov 13, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Replacement of an existing overhead sign structure on Interstate 70 in Wyandotte County, Kansas. The structure is located at Sta. 105S0350, I-70 EB, with coordinates 39.11006, -94.61946.
Key dates
- Questions due
- Nov 13, 2026, 1:00 PM Central Time
- Pre-bid meeting
- Nov 13, 2026, 1:00 PM Central Time
- Bids due
- Dec 16, 2026, 1:00 PM CT
Documents
- 526126131.pdf
- 526126131p.pdf34 pages
More from this agency
- Bridge Repair — Sedgwick County, Kansas — closes Dec 16, 2026
- Grading, Bridge, and Surfacing — Phillips County, Kansas — closes Dec 16, 2026
- Milling and HMA Overlay — Greenwood County — closes Dec 16, 2026
- Milling and HMA Overlay — Wyandotte County — closes Dec 16, 2026
- Bridge Repair — Wyandotte County, Kansas — closes Dec 16, 2026
Closing this week nearby
- Switchgear Transformer Replacement — closes Nov 23, 2026
- J065--Pyxis Carousel Maintenance — closes Nov 23, 2026
- Automatic Transfer Switch (ATS) Preventive Maintenance and Repair Services, and Isolation Power Panel Inspection at… — closes Nov 23, 2026
- Q517--PHARMACY BENEFITS SERVICES | WICHITA | — closes Nov 23, 2026
- Licensed Well Drilling Services for KGS — closes Nov 23, 2026