Site Work – Southwestern Illinois College Tactical Village
Southwestern Illinois College — Purchasing DepartmentBelleville, Illinois
Southwestern Illinois College is soliciting bids for site work at the Tactical Village located at 2590 South Belt West, Belleville, IL. The scope includes site preparation, grading, drainage, paving, and related site improvements. A pre-bid meeting is scheduled for November 24, 2026, at 10:00 A.M. at the jobsite. The solicitation is an Invitation to Bid (ITB) issued by the Purchasing Department.
On PublicBidSearch: the original bid posting and the agency contact (email) for this bid.
Contact
Agency contact for this bidEmail — included with ProProOverview
- Due
- Dec 2, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 2, 2026, 2:00 PM Central Time
- Submission
- mail, hand delivery
Scope of work
- Paving of access roads and parking areas
- Installation of stormwater drainage systems
- Construction of sidewalks and curbs
Steps to Bid
- 1
Register with Southwestern Illinois College Purchasing Department if required.
- 2
Attend the pre-bid meeting on November 24, 2026, at 10:00 A.M. at the jobsite (2590 South Belt West, Belleville, IL). by Nov 24, 2026, 10:00 AM
- 3
Submit a bid response by December 2, 2026, at 2:00 P.M. Central Time. by Dec 2, 2026, 2:00 PM
What you'll need
Submission
Mail, Hand delivery
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Key dates
- Pre-bid meeting
- Nov 24, 2026, 10:00 AM Central Time
- Bids due
- Dec 2, 2026, 2:00 PM CT
More from this agency
- Pressure Grouting for Southwestern Illinois College Tactical Village — closes Dec 2, 2026
- Invitation to Bid: Site Work for the Tactical Village at the Southwestern Illinois Justice and Workforce Development… — closes Dec 2, 2026
- Pressure Grouting for the Tactical Village at the Southwestern Illinois Justice and Workforce Development Campus — closes Dec 2, 2026
- Parking Lot Recoating and Pavement Marking Restoration – Sam Wolf Granite City Campus — closes Dec 10, 2026
- Parking Lot Milling and Asphalt Overlay – Sam Wolf Granite City Campus — closes Dec 10, 2026
Similar open bids
- Utility Excavation and Repair Services IDIQ — ENERGY, DEPARTMENT OF
- MISSISSIPPI RIVER BASIN BETTENDORF, IOWA LOCAL FLOOD PROTECTION BETTENDORF, IOWA 2024 EVENT PL84-99 FLOOD REPAIRS — DEPT OF THE ARMY
- Alternative Water Source Program (AWSP) Finished Water Transmission Main – Segment C — Illinois Grand Prairie Water Commission
Closing this week nearby
- Erie Elementary Charter School: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 20, 2026
- E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 20, 2026
- Erie Elementary Charter School: E-Rate FY2027 Category 2 - Antennas, Connectors, and Related Components — closes Nov 20, 2026
- E-Rate FY2027 Category 1 Internet Access and Data Transmission Services — closes Nov 20, 2026
- E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — closes Nov 20, 2026