OpenConstructionCloses Jan 7, 2027, 2:00 PM CT

OPS Skinner Elementary School Flooring Replacement

Omaha Public Schools — PurchasingOmaha, Nebraska#27-009

Omaha Public Schools is soliciting bids for the replacement of flooring at Skinner Elementary School, including removal of existing carpet, tile, and wall base, and installation of new flooring in designated rooms. The work must be completed by July 31, 2027. A mandatory pre-bid meeting is required on December 21, 2026, at 10:00 AM CT. The Contractor must comply with E-Verify and the Employee Classification Act.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 7, 2027, 2:00 PM CT
Time stated in bid documents
Jan 7, 2027, 2:00 PM Central Time
Submission
mail, hand delivery
Contract term
120 calendar days from notice to proceed
Documents analyzed
3 published · 1 analyzed

Scope of work

  • Remove and dispose of existing carpet, tile, and wall base
  • Comply with best trade practices and protect existing construction

Steps to Bid

  1. 1

    Review the full Bid Documents, including the Contract Specifications, Project Drawings, and Bid Submission Instructions.

  2. 2

    Attend the mandatory pre-bid meeting at Skinner Elementary School on December 21, 2026, at 10:00 AM CT. Attendance is required to submit a bid. by Dec 21, 2026, 10:00 AM

  3. 3

    Submit any questions in writing via email to [email available with Pro] by 2:00 PM CT on December 22, 2026. by Dec 22, 2026, 2:00 PM

  4. 4

    Prepare the bid proposal on the unaltered OPS bid form, including all required attachments.

  5. 5

    Submit the bid in a sealed opaque envelope or container, clearly marked with the bid number, title, and deadline, to the District Operational Services, 3215 Cuming St., Omaha, NE 68131. by Jan 7, 2027, 2:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

238290, 238299

How to submit

Bids must be submitted in a sealed opaque envelope or container, clearly marked with the bid number, title, and deadline. The envelope must be delivered to the Security Desk at the East Entrance of the Teacher Administrative Center, 3215 Cuming St., Omaha, NE 68131. Bids must be received by 2:00 PM CT on January 7, 2027. Late bids will not be accepted. Bids may be submitted in person or by mail or courier. The time stamp on the District Operational Services time clock will be the official clock for determining the time of submission.

In person/mail: Omaha Public Schools, District Operational Services, 3215 Cuming St., Omaha, NE 68131

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Omaha Public Schools (OPS) invites bids for the removal and disposal of existing flooring and installation of new flooring at Skinner Elementary School, located at 4304 N 33rd Street, Omaha, NE 68111. Work must be performed in accordance with the Contract Specifications and Project Drawings (Exhibit A), including compliance with best trade practices, protection of existing construction, and daily debris removal. The Contractor must have at least one experienced journeyman flooring installer for every two workers, with a minimum of three workers on site at all times. Work hours are 6:30 AM – 5:00 PM CT, Monday–Friday, excluding District holidays. Substantial completion is required by July 31, 2027.

Key dates

Pre-bid meeting
Dec 21, 2026, 10:00 AM Central Time
Bids due
Jan 7, 2027, 2:00 PM CT
Expected award
Feb 1, 2027

Documents

  • 27-009SkinnerFlooringReplacement.pdf28 pages
  • 27-0091stFloorDrawings.pdf1 pages
  • 27-0092ndFloorDrawings.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby