OpenConstructionCloses Dec 3, 2026

SLCo SLP110326 SPCC Renovation Bid Package #00-Group #2 Preconstruction Assistance - Courtesy Notice

Salt Lake CountyUtah#SLCo SLP110326 - RFI

The solicitation covers metal panels, curtain wall, elevators/escalators, telecommunications, and audio-visual systems. The Pre-Construction phase is expected to run from December 2026 to September 2027. An NDA is required before document access. Proposals must be submitted via Building Connected. The deadline is December 3, 2026, at 3:00 PM MT. The County is not conducting the procurement; vendors must contact Jacquie White for award confirmation.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 3:00 PM Mountain Time
Submission
online portal
Required submission items
2 items · full checklist with Pro

Scope of work

  • Pre-Construction Assistance for metal panels (07.60)
  • Pre-Construction Assistance for curtain wall and glazed assemblies (08.40)
  • Pre-Construction Assistance for elevators and escalators (14.00)
  • Pre-Construction Assistance for telecommunications and electronic safety & security (27.20)
  • Pre-Construction Assistance for audio-visual systems (27.40)

Steps to Bid

  1. 1

    Register and gain access to Building Connected via the platform link.

  2. 2

    Request the NDA and access to the Bid Manual from Jacquie White at [email available with Pro].

  3. 3

    Review the full solicitation, including the Bid Manual, RFP, and all requirements.

  4. 4

    Ensure all submissions are made through Building Connected; submissions via U3P Bonfire will not be considered. by Dec 3, 2026, 3:00 PM

What you'll need

Submission

Online portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project includes a partial remodel and rebuild of the Salt Palace Convention Center (SPCC) in Salt Lake City, Utah, with coordination required with Smith Entertainment Group’s contractor for any work impacting the remodel, rebuild, or adjacent areas. The Pre-Construction Assistance phase is anticipated to begin in December 2026 and continue until Construction Documents are finalized and permitted, expected by September 2027. Upon completion of design, the selected partner will provide a Fixed Lump Sum for the construction-phase work within the negotiated FLCC. An NDA is required prior to document release. The proposal submission platform is Building Connected. Ties will be resolved by the Tie-Break procedure in the RFP. The County is not issuing or conducting the procurement; vendors must review the full solicitation on the provided link to comply. The contract award will not be posted on the website. Vendors must contact the designated individual (Jacquie White) to confirm award status.

Key dates

Questions due
Nov 20, 2026, 3:00 PM Mountain Time
Bids due
Dec 3, 2026