Smith-Cotton Junior High Flooring Replacement
Sedalia School District 200Sedalia, Cass, Missouri
The Sedalia School District 200 is soliciting sealed bids for the replacement of resilient flooring at Smith-Cotton Junior High School. The scope includes removal of existing flooring and installation of new resilient flooring. A mandatory pre-bid conference is required on 18 November 2026 at 10:00 a.m. at the project site. Bids must be submitted by 1:00 p.m. local time on 2 December 2026. Bid documents are available online starting 12 November 2026.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 2, 2026, 1:00 PM CT
- Time stated in bid documents
- Dec 2, 2026, 1:00 PM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 2 published · 1 analyzed
Steps to Bid
- 1
Obtain bid documents from Drexel Technologies at Official linkPro starting 12 November 2026. was Nov 12, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 2
Attend the mandatory pre-bid conference on 18 November 2026 at 10:00 a.m. at Smith-Cotton Junior High, 312 E Broadway Blvd, Sedalia, MO 65301. was Nov 18, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Prepare and submit sealed bid by 1:00 p.m. local time on 2 December 2026. by Dec 2, 2026, 1:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
336115, 238290
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Key dates
- Pre-bid meeting
- Nov 18, 2026, 10:00 AM Central Time
- Bids due
- Dec 2, 2026, 1:00 PM CT
Documents
- JHFlooringBids1109.pdf1 pages
- BidAdforFlooringAbatement.pdf1 pages
More from this agency
Similar open bids
- Senior Center Carpet Replacement — City of O'Fallon
- Main Room & Kitchenette Flooring Replacement at Clinton Community Building — City of Sikeston
- CONTRACT - Carpets — City of St. Louis
- Eagan Gymnasium Flooring Resurface — City of Florissant
- Sedalia School District - Smith Cotton Junior High Flooring Replacement — City of Sedalia
Closing this week nearby
- Restraining Rail Curve Project 2668 — closes Nov 18, 2026
- Purchase of One (1) 48x72 Duplex Pump Basin System — closes Nov 18, 2026
- Clamp Hose Ct-9410 9/16 - 1 1/16 (Part 0792038) — Must Match OEM Number, No Substitutions — closes Nov 18, 2026
- Purchase of Front Left Floor Bumper Assembly, Part 0810205, for 3500–7500 Series Vehicles (3-Piece Complete) — closes Nov 18, 2026
- WTP Pipe Gallery Replacement - St. Charles County, MO — closes Nov 18, 2026