Solar and Battery Feasibility Study
City of AshevilleNorth Carolina#298-FY27-CAM-RFQ-SolarFeasibilityStudy
The study will assess technical and financial viability, including structural readiness, utility interconnection, and peak-shaving BESS potential. Site visits are required. The City will provide available records and data. Submissions must be emailed by December 11, 2026, at 4:00 PM EST.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 11, 2026, 4:00 PM Eastern Time
- Submission
- Documents analyzed
- 2
Scope of work
- Conduct a feasibility study for solar PV and battery energy storage at six City of Asheville facilities.
- Evaluate structural and roof readiness, utility interconnection, and site constraints.
- Assess peak-shaving BESS feasibility and financial return.
- Develop a 'Playbook' scoring rubric and template for future site screening.
- Deliver a consolidated report with modular site packages and editable financial models.
Steps to Bid
- 1
Review the RFQ and Addendum 1 by Dec 11, 2026, 3:00 PM
- 2
Submit questions via email to Sierra Branch by November 16, 2026, 5:00 PM EST was Nov 16, 2026, 10:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Attend the pre-submittal meeting (optional) on November 12, 2026, 2:00 PM EST via Google Meet was Nov 12, 2026, 7:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Prepare and submit the Statement of Qualifications (SOQ) via email to [email available with Pro] by Dec 11, 2026, 3:00 PM
What you'll need
Submission
NAICS
541611
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Request for Qualifications (RFQ) for a conceptual, planning-level feasibility study to assess the technical viability, financial return, and project prioritization of photovoltaic (PV) solar and battery energy storage system (BESS) installations at six City of Asheville municipal facilities. The study is not for final design, construction documents, or binding quotes. Submission is by email only.
Key dates
- Questions due
- Nov 16, 2026, 5:00 PM Eastern Time
- Pre-bid meeting
- Nov 12, 2026, 2:00 PM Eastern Time
- Bids due
- Dec 11, 2026
Documents
- POSTED_Advertisement_298-FY27-CAM-RFQ-SolarFeasibilityStudy.pdf1 pages
- POSTED_Addendum_1_-_298-FY27-CAM-RFQ-SolarFeasibilityStudy.pdf18 pages
More from this agency
- Richmond Hill Recovery Trail Re-Construction · closes Dec 1, 2026
- FY27 Utility Cut Concrete Repair · closes Dec 2, 2026
- Lexington Avenue Sidewalk Restoration Project · closes Dec 3, 2026
- Consulting for Radio Tower Microwave System Replacement · closes Jan 7, 2027
- Construction Manager at Risk Services for French Broad River Parks Recovery Project · closes Jan 14, 2027
Closing soon near Asheville
- Arboretum Property Fencing Repairs · Asheville · closes Dec 2, 2026
- Property Fencing Repair · Asheville · closes Dec 2, 2026
- Police Vehicle Graphic Replacement · Asheville · closes Dec 3, 2026
- Medical Waste Removal and Recycling Services · Asheville · closes Dec 4, 2026
- Refrigerated Beer Tap Trailer · Asheville · closes Dec 4, 2026