ClosedRFPClosed Nov 27, 2026, 11:59 PM CT

E-Rate Category 2: Network Switches, Fiber Optic Components, and Software Licenses — South Page Comm School Dist, College Springs, IA

South Page Comm School DistCollege Sprs, Iowa#270003048

The procurement includes 4 Meraki C9300L-48UXG-4X switches with 1-, 3-, or 5-year licenses (or equivalent), 3 LC-to-LC fiber patch cables, 6 MA-SFP-1G-LR SFP modules, and 6 MA-SFP-10G-LR SFP modules. Bidders must itemize equipment, installation, and tax/shipping costs separately. Each bid must include make, model, SKU, warranty terms, and license duration. Equivalent equipment requires proof of equivalency. All equipment must be new and current model. Software licenses must be labeled as IC or BMIC. Installation bids must include the installer’s city and state. Bidders must agree to E-Rate discounted billing (Form 474/SPI) and include a statement. Robo-bids and spam will be rejected. The deadline is 9:00 AM Central time, 29 days after the Form 470 was posted. Bids must be submitted via email to [email available with Pro]. No phone or text communication. SPIN must be included. The FCC LCP rule applies. Bidders must certify compliance with FCC 19-121 and E-Rate gift rules. The competitive window is 28 days, with the allowable contract date set at 2026-11-27.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 27, 2026, 11:59 PM CT
Submission
email
Documents analyzed
1

Steps to Bid

  1. 1

    Review the full Form 470 and all associated documentation.

  2. 2

    Ensure compliance with FCC 19-121: no equipment or services from Huawei, ZTE, Hytera, Hangzhou, Dahua, Pacific Network Corp, ComNet (USA) LLC, China Unicom (Americas), or any other covered national security threat entity.

  3. 3

    Confirm that all equipment is new and the most current model available.

  4. 4

    Include the make, model, and SKU of all equipment. Specify warranty terms and license duration.

  5. 5

    If submitting equivalent equipment, prepare and attach evidence of equivalency.

  6. 6

    Designate software licenses as IC or BMIC.

  7. 7

    If including installation, specify the installer’s city and state.

  8. 8

    Include SPIN in the bid.

  9. 9

    Submit the proposal via email to [email available with Pro] by 9:00 AM Central time, 29 days after the Form 470 was posted.

  10. 10

    Do not submit via phone, text, or in person. All communication must be via email.

What you'll need

Contract duration

From date of bid to September 30, 2028

Submission

Email

NAICS

541512, 541513

How to submit

Proposals must be e-mailed to [email available with Pro]. No phone calls or texts. All communication must be via email. Include SPIN in the bid. Do not submit via postal mail, hand delivery, or fax.

Get alerts for bids like this

New IT and technology bids in Iowa

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The solicitation is for the procurement of network infrastructure equipment and associated services, including: (1) 4 units of Meraki C9300L-48UXG-4X Data Transport Switches with 1-, 3-, or 5-year software license options (or equivalent); (2) 3 units of ~3 ft / 1 meter LC-to-LC duplex single-mode fiber optic patch cables (or equivalent); (3) 6 units of MA-SFP-1G-LR SFP modules (or equivalent); and (4) 6 units of MA-SFP-10G-LR SFP modules (or equivalent). Bids must specify the manufacturer’s warranty terms and license duration. If submitting equivalent equipment, providers must supply evidence of equivalency. Software licenses must be designated as either Internal Connections (IC) or Basic Maintenance of Internal Connections (BMIC). Bidders must be willing to provide E-Rate discounted billing (Form 474/SPI invoicing) and include a statement to that effect. Robo-bids and spam submissions will be disqualified. The applicant reserves the right to reject all proposals or cancel the request. Prices must remain firm from the bid date through September 30, 2028. Bid evaluation may include points for local presence (within 150 miles) and for a complete solution. No phone calls or texts. Bidders must certify compliance with FCC 19-121, which prohibits equipment or services from Huawei, ZTE, Hytera, Hangzhou, Dahua, Pacific Network Corp, ComNet (USA) LLC, China Unicom (Americas), or any other covered national security threat entity. E-Rate gift restrictions under 47 CFR 54.503(d) apply. The applicant will consider all bids received after the deadline only at its discretion.

Documents

  • 22850734-USAC_FCC_FORM_470_APPLICATION_270003048_CERTIFIED.pdf6 pages

See all documents · Download with Pro

Similar bids in Iowa

Closing soon in Iowa