Grayling High School Speaker and Amplification Upgrade
Crawford AuSable School DistrictGrayling, Michigan
Crawford AuSable School District is soliciting sealed proposals for the upgrade of the main speaker array and amplification system at Grayling High School. The scope includes removal of existing equipment, installation of 8 JBL VTX A8 line-array loudspeakers, 2 JBL VTX A8 AF array frames and rigging assemblies, 1 Crown IT4X3500HD four-channel power amplifier, and all required materials. Contractors must verify mounting conditions, reuse existing wiring where suitable, and provide full system setup, testing, and staff orientation. A mandatory prebid meeting is scheduled for December 2, 2026, at 1:00 p.m. at the school’s main office. Proposals must be submitted by December 18, 2026, at 1:00 p.m. local time, to the District Administration Office. Required submissions include a completed bid form with itemized pricing, manufacturer data, installation schedule, warranty terms, service response information, three references, certificate of liability insurance, Form W-9, sworn and notarized Familial Relationship Disclosure, and signed Iran Economic Sanctions Act Affidavit.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 18, 2026
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 6 items · full checklist with Pro
Steps to Bid
- 1
Review the full RFP and all attachments, including the Bid Proposal Form, Familial Relationship Disclosure, and Iran Economic Sanctions Act Affidavit.
- 2
Attend the mandatory prebid meeting and site walk-through on December 2, 2026, at 1:00 p.m. at the main office of Grayling High School. by Dec 2, 2026, 1:00 PM
- 3
Submit all required documents, including the completed and signed Bid Proposal Form, manufacturer data, installation schedule, warranty terms, service response information, three references, certificate of liability insurance, Form W-9, sworn and notarized Familial Relationship Disclosure, and Iran,
What you'll need
Insurance
RequiredThe contractor and its subcontractors must maintain workers’ compensation coverage as required by law, employer’s liability of at least $500,000, and general liability insurance with limits of at least $1,000,000 per occurrence and $2,000,000 aggregate. Required coverage must remain in force throughout the work. Updated evidence of insurance is due within 15 working days of award and before work begins. Failure to provide it may result in rescission of the award.
Submission
Mail, Hand delivery
NAICS
561720, 541330
How to submit
Sealed proposals must be delivered to the District Administration Office. Mark the envelope 'GHS Speaker and Amplification Upgrade.' Late proposals will be returned unopened.
In person/mail: Tim Sanchez, Superintendent, Crawford AuSable School District, 1135 North Old 27, Grayling, MI 49738
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 6-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contractors must verify mounting conditions, reuse existing wiring where suitable, test compatibility, and reconfigure the system to align with venue acoustics. The District will supply a scissor lift and dispose of removed equipment. A mandatory prebid meeting and site walk-through will be held at 1:00 p.m. on December 2, 2026, at the main office. Bids will be publicly opened at 1:05 p.m. on the same day at Grayling High School.
Key dates
- Pre-bid meeting
- Dec 2, 2026, 1:00 PM Eastern Time
- Bids due
- Dec 18, 2026
Documents
- GHS_Speaker_System_RFP.pdf6 pages
More from this agency
- Speaker & Amplification Upgrade at Grayling High School Auditorium · closes Dec 18, 2026
Similar bids near Grayling
- Surplus Equipment Sale · East Jordan · closes Dec 2, 2026
Closing soon near Grayling
- Request for Proposals (RFP) for Services and Supplies — Central Lake Public Schools · Central Lake · closes Nov 30, 2026
- Six-Year Substation Maintenance – RFP · Traverse City · closes Dec 2, 2026
- Snow Clearing Services for Gladwin Rural Urban Fire Department · Gladwin · closes Dec 4, 2026