SSCBC Pharmacy RTU Supply Exhaust and Control Replacements — Design-Build Request for Qualifications
The Ohio State UniversityOhio#OSU-275082-DB
The project includes replacing the failing AAON rooftop unit, installing N+1 redundant exhaust fans, retrofitting airflow valves with integrated BAS control, sealing partition walls, and upgrading lighting to sealed LED cleanroom luminaires. The construction budget is capped at $2,142,199.00, with a total project cost of $2,750,000.00. The selected firm must participate in the EDGE Business Assistance Program, comply with OSU safety and health policies, and use eBuilder for project closeout. The Davis-Bacon prevailing wage applies. The RFP will be issued on 12/23/2026, proposals due 01/29/2027, interviews on 02/09/2027, and selection on 02/11/2027.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 15, 2026
- Submission
- Contract term
- 3 years + two additional one-year renewal terms
- Documents analyzed
- 1
- Required submission items
- 9 items · full checklist with Pro
Scope of work
- Replace failing AAON rooftop air-handling unit
- Retrofit supply and exhaust airflow valves with low-pressure Antec Venturi valves
- Seal above-ceiling partition walls for room pressurization
- Replace lighting with chemical-resistant sealed LED cleanroom luminaires
- Complete full-system commissioning and third-party certification
Steps to Bid
- 1
Submit any questions in writing to William Eblin at [email available with Pro], with the project number and name in the subject line. Questions will be answered and posted on the OFCC website. by Dec 8, 2026, 11:59 PM
- 2
Submit the RFP response (including pricing and proposal) by 01/29/2027. by Jan 29, 2027
- 3
Attend the interview scheduled for 02/09/2027. by Feb 9, 2027
What you'll need
Insurance
RequiredRequired Professional Liability Insurance will be per General Conditions Articles 10.3.7, 10.3.8 and 10.3.9.
Submission
NAICS
238290, 238210, 541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 9-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Request for Qualifications (Design-Build) for the modernization of mechanical systems in the oncology compounding pharmacy cleanroom (Suite 4200) on the fourth floor and roof of the Stefanie Spielman Comprehensive Breast Center (SSCBC), The Ohio State University. The project is delivered via Design-Build with a competitive Guaranteed Maximum Price (GMP) process. The Contracting Authority reserves the right to reject all proposals or cancel the solicitation. The selected firm must participate in the EDGE Business Assistance Program and comply with Ohio State University’s safety, vaccination, and background check policies. The DB will be required to use eBuilder Project Management System for closeout and adhere to OSU Project Closeout Standards. The Davis-Bacon Wage Rate Determination applies.
Key dates
- Questions due
- Dec 8, 2026, 11:59 PM Eastern Time
- Bids due
- Dec 15, 2026
- Expected award
- Feb 11, 2027
Documents
- RFQ-OSU-275082.pdf6 pages
More from this agency
- Ohio Stadium - HVAC Replacement — Request for Qualifications (Planning Services) · closes Nov 30, 2026
Similar bids in Ohio
- Replacement of HVAC System at Sterling Branch, Cleveland Public Library · closes Dec 4, 2026
- Procurement of Mechanical Stop (NSN 5340015137742), Quantity 33 Units · closes Dec 11, 2026
- Guard, Mechanical Drive (NSN 3020013407126) – 60 Units · closes Dec 2, 2026
- New HVAC System Installation in OSSB Dorm 6 · closes Dec 3, 2026
- Procurement of Electro-Mechanical Actuator, NSN 4810015394781 · closes Dec 7, 2026
Closing soon in Ohio
- Strip, Electrical Grounding - NSN 5999014917014 · closes Dec 1, 2026
- Procurement of Linear Actuator Rods, Pistons, and Components (NSN 3040016723038) · closes Dec 2, 2026
- Procurement of Antenna (NSN 5985015020040), Quantity 57 Units · closes Dec 2, 2026
- Procurement of Coupling Half, Quick Disconnect (NSN 4730016576292) · closes Dec 3, 2026
- Amplifier, Radio Frequency (NSN 5996997899868) – Procurement for 4 Units · closes Dec 3, 2026