Statewide Electrical Engineering Design Services for Traffic Control Devices and Roadway Lighting
Kentucky Transportation Cabinet — Traffic OperationsFrankfort, Kentucky
The contract term is two years, with a maximum of $500,000 per consultant and $300,000 per assignment. Consultants must be prequalified in roadway lighting and traffic signals. Work will be assigned rotationally, with the option to assign outside rotation. The selected firms must use AGi32 software for lighting analysis, comply with MUTCD, FAA, KAZC, and KRS 176.056, and disclose any AI use.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 4:30 PM Eastern Time
- Submission
- online portal
- Contract term
- Two Years
- Documents analyzed
- 1
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Design of electrical traffic control devices and roadway lighting systems
- Preparation of plans, specifications, and standard detail sheets
- Site surveys with elevation requirements
Steps to Bid
- 1
Register on the KYTC Professional Services portal
Visit [link available with Pro] to register and create a profile.
- 2
Ensure prequalification in required areas by Dec 2, 2026, 4:30 PM
Consultants must be prequalified in 'Electrical Engineering Roadway Lighting' and 'Electrical Engineering Traffic Signals' by the response due date.
- 3
Submit proposal via the online portal by Dec 2, 2026, 4:30 PM
All responses must be submitted through the KYTC Professional Services portal at [link available with Pro].
- 4
Attend the Pre-Design Conference (optional but recommended) by Jan 4, 2027
The Pre-Design Conference is scheduled for January 4, 2027. Attendance is not mandatory but strongly encouraged.
What you'll need
Prequalification
RequiredContract duration
Two (2) years from Notice to Proceed
Submission
Online portal
NAICS
541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Coast Guard navigational lighting standards, and KRS 176.056 regarding light trespass. AGi32 software must be used for all lighting analyses. The contract term is two years from Notice to Proceed, with no new work assigned after that date. The Department may combine multiple projects into a single assignment. A Consultant failing to respond to an assignment within five business days may be skipped in the rotation.
Key dates
- Bids due
- Dec 2, 2026
- Expected award
- Dec 18, 2026
Documents
- 2027-05_-_Statewide_Electrical_Engineering_Design_Services.pdf4 pages
More from this agency
- Sealed Bids for Materials and Labor for Track Rehabilitation Project in Jefferson and Woodford Counties, Kentucky — closes Dec 1, 2026
- Sealed Bids for Labor and Equipment and Materials for Track Rehabilitation Project in Jefferson and Woodford Counties,… — closes Dec 1, 2026
- Statewide Bridge Delivery Program - General Engineering Consultant (GEC) — closes Dec 2, 2026
- I-71 Feasibility Study for Additional Connection in Northeast Oldham County, Kentucky — closes Dec 2, 2026
- KYTC - D-9 Carter County East Bound Renovation — closes Dec 8, 2026
Similar open bids
- LEX Triannual Energy Study and ARC Flash Testing — VETERANS AFFAIRS, DEPARTMENT OF
- LEX Triannual Energy Study and Arc Flash Testing — VETERANS AFFAIRS, DEPARTMENT OF
- TRAINING CENTER — City of Frankfort
- Six (6) Community Notification Siren Upgrades (EMA) – Daviess County Fiscal Court — Daviess County Fiscal Court
- Community Notification Siren Replacement Project (EMA) — Daviess County Fiscal Court
Closing this week nearby
- Kosair Charities Pediatrics First Floor Renovation — closes Nov 20, 2026
- Filter RFP for Pulaski County School System — closes Nov 20, 2026
- CITY OF PIKEVILLE Telecommunications Provider Franchise — closes Nov 23, 2026
- Telecommunications Franchise — closes Nov 23, 2026
- Mountain Parkway Extension to Prestonsburg – Electrical Conduit and Site Work — closes Nov 23, 2026