OpenIFBCloses Dec 2, 2026

Stockdale High School: Baseball and Softball Scoreboard

Kern High School District — Business Services DepartmentBakersfield, Kern, California#Bid No. 7332

Work includes removal of existing structures and foundations, installation of new concrete foundations and steel support columns, underground conduit and paving, electrical systems, and full integration and testing of the new scoreboard. This is a prevailing wage project. A non-mandatory pre-bid meeting is scheduled for November 19, 2026, at 10:00 a.m. Bids must be received by 2:00 p.m.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 2, 2026
Time stated in bid documents
Dec 2, 2026, 2:00 PM Pacific Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
120 calendar days from Notice to Proceed
Documents analyzed
4 published · 2 analyzed
Required submission items
1 items · full checklist with Pro

Scope of work

  • Demolish existing baseball and softball scoreboards and support columns
  • Remove material below footing to 6–12 inches depth
  • Set and install new scoreboard units
  • Install electrical conduits, conductors, pull boxes, and grounding systems

Steps to Bid

  1. 1

    Review the bid documents, including plans and specifications, available at Official linkPro or at Blueprint Services Company, 1100 18th Street, Bakersfield, CA 93301.

What you'll need

Submission

Mail, Hand delivery

NAICS

11111, 91200, 91300, 91396, 91430, 91438, 91479

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Supervision and coordination required to demolish the existing scoreboards and install owner-furnished, contractor-installed scoreboards. Work shall include, but not be limited to: demolition and removal of the existing scoreboards and support columns; chipping out and removal of existing material below the footing to a minimum depth of 6–12 inches; furnishing and installing concrete foundations and steel support columns; installation of underground conduits and concrete paving; setting and installation of the new scoreboards; installation of electrical conduits, conductors, pull boxes, grounding systems, and associated power and control connections. Contractor shall provide all necessary connections, terminations, testing, and coordination to deliver a complete, operational, and fully functional scoreboard installation. Contractor shall also provide coordination with the scoreboard manufacturer for commissioning, startup, testing, and final system acceptance.

Key dates

Pre-bid meeting
Nov 19, 2026, 10:00 AM Pacific Time
Bids due
Dec 2, 2026

Documents

  • Californian_Ad_Construction_Revised.pdf2 pages
  • DVBE_Ad_Construction_Revised.pdf2 pages

2 agency-portal links

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby