Streambank Stabilization and Utility Pole Repair Project
Dubois & King INCRandolph, Vermont#77303
The Village of Johnson, VT, is soliciting bids for streambank stabilization and utility pole repair following flood damage. Work includes securing a utility pole and stabilizing the Gihon River bank in Lamoille, VT. The project must be completed by July 30, 2027. A pre-bid site walkthrough is scheduled for November 30, 2026, at 10:00 AM. Bidders must submit a sealed bid in person or by mail to the Johnson Municipal Building. Bidders must submit references, subcontractor details, and compliance forms.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 7, 2026
- Time stated in bid documents
- Dec 7, 2026, 2:00 PM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 12 months + Two additional one-year renewal terms
- Documents analyzed
- 1
- Required submission items
- 7 items · full checklist with Pro
Scope of work
- Secure the utility pole and re-secure the remaining guidewires
- Comply with Vermont wetland and flood mitigation permits
- Conduct work during restricted hours: 7:30 AM–7:00 PM, Monday–Friday
Steps to Bid
- 1
Obtain the bid documents from DuBois & King, Inc. via the official website or by contacting the issuing office.
- 2
Attend the pre-bid site walkthrough on November 30, 2026, at 10:00 AM at the project site. by Nov 30, 2026, 10:00 AM
- 3
Submit questions to Erik Bailey via email by December 2, 2026. by Dec 2, 2026, 11:59 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237190, 237990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 7 watch-outs that disqualify bidders
- The 7-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project involves securing a utility pole and stabilizing the streambank along the Gihon River in Lamoille, Vermont, following damage from the July 2024 flood, which unearthed one of four guidewires. The utility lines serve critical Village of Johnson infrastructure, including the wastewater treatment plant, municipal office, fire station, and municipal utility garages. Failure to stabilize the bank and secure the remaining guidewires risks catastrophic power disruption. The selected contractor will supply all labor, materials, equipment, and subcontractor coordination. No work is permitted on weekends or holidays without prior approval. Access is via Route 15 and designated site entrances. The Village reserves the right to reject any or all bids, conduct interviews, and perform value engineering. Bidders must submit two project references, subcontractor names, and anticipated start/end dates. No electronic or faxed bids will be accepted.
Key dates
- Pre-bid meeting
- Nov 30, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 7, 2026
- Expected award
- Dec 15, 2026
Documents
- Village_of_Johnson_Utility_Pole_Repair_Request_for_Bids.pdf5 pages
More from this agency
- Waitsfield Wastewater Treatment Facility Contract 1 — closes Dec 22, 2026
- Waitsfield Community Wastewater System Contract 2 — closes Dec 23, 2026
Similar open bids
- Calahan Park Shared Use Path – Burlington TAP TA23(15) — BURLINGTON PARKS AND RECREATION DEPT
- Ethan Allen Air Force Base (EAAFB) Regional Training Institute (RTI) Latrine and Locker Room Renovation — State of Vermont Military Department
- Brownfields Revolving Loan Fund — CENTRAL VERMONT REGIONAL PLANNING COMMISSION
- State House Pandemic Mitigation/Renovation Project — Buildings & General Svs, Office of Purchasing & Contracting
- Burlington-Winooski BF RAIZ (2) & Burlington STP 5000(29) Request for Proposal — Agency of Transportation - Contract Administration
Closing this week nearby
- FC0003-01 On Ramp Facilities Job Order Contract — closes Nov 20, 2026
- Fleet Fuel Services RFP for 2026-2027 Academic Year — closes Nov 23, 2026
- Request for Fleet Vehicle Fueling Proposals — closes Nov 23, 2026
- CG Station Burlington Replacement Water Heaters — closes Nov 23, 2026
- Roadside Hazardous Tree Removal Project – Town of Norwich, Vermont — closes Nov 23, 2026