The U.S. Department of Defense, through the Defense Logistics Agency (DLA), is soliciting quotes for 218 units of Stud, Turnlock Fastener (NSN: 5325-01-390-5205). The item is to be delivered FOB Origin. A First Article Test (FAT) requires delivery of 2 units within 90 days of contract award to Robins AFB, GA. Additive manufacturing is prohibited. Offerors must represent they do not provide covered defense telecommunications equipment or services. Hazardous materials require Safety Data Sheets. All quotes must be submitted via DIBBS.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026
Submission
electronic portal
Documents analyzed
1

Steps to Bid

  1. 1

    Access the DLA Internet Bid Board System (DIBBS) at Official linkPro and submit the quotation electronically via the DIBBS platform. by Dec 4, 2026, 4:59 AM

  2. 2

    Submit a DIBBS quote with a bid type of 'No Bid' if unable to quote or intending to quote after the deadline. by Dec 4, 2026, 4:59 AM

What you'll need

Submission

Electronic portal

NAICS

332510

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Procurement of 218 units of Stud, Turnlock Fastener (NSN: 5325-01-390-5205) under Purchase Request 7016228709. First Article Test (FAT) requires delivery of 2 units within 90 calendar days from contract award to Warner Robins Alcmc, Attn: First Article - Do Not Post, 450 Third Street, Robins AFB, GA 31098-1887. Inspection reports to be sent to 402 MXSG/MXRILM, Attn: First Article Test Lab, 450 Third St, Bldg 323, Robins AFB, GA 31098-1640. Acceptance and approval notification to be issued within 105 calendar days after Government receives FAT units. Offerors must comply with ISO 9001:2015 or equivalent for manufacturing inspection. All quotes must be submitted via DLA Internet Bid Board System (DIBBS) at [link available with Pro].

Key dates

Questions due
Dec 4, 2026, 4:59 AM
Bids due
Dec 4, 2026